{"id":24960,"date":"2019-06-06T16:56:00","date_gmt":"2019-06-06T22:56:00","guid":{"rendered":"https:\/\/www.summitdaily.com\/news\/drivers-should-expect-delays-during-i-70-avon-to-vail-paving-project\/"},"modified":"2019-06-06T16:56:00","modified_gmt":"2019-06-06T22:56:00","slug":"drivers-should-expect-delays-during-i-70-avon-to-vail-paving-project","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kift\/local-news\/drivers-should-expect-delays-during-i-70-avon-to-vail-paving-project\/","title":{"rendered":"Drivers should expect delays during I-70 Avon to Vail paving project"},"content":{"rendered":"<figure class=\"wp-block-image\">\n<div class=\"caption-container\"><img loading=\"lazy\" decoding=\"async\" width=\"612\" height=\"382\" src=\"https:\/\/cdn.summitdaily.com\/wp-content\/uploads\/sites\/2\/2019\/05\/TrafficAlertWebCard-SDN.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/cdn.summitdaily.com\/wp-content\/uploads\/sites\/2\/2019\/05\/TrafficAlertWebCard-SDN.jpg 612w, https:\/\/cdn.summitdaily.com\/wp-content\/uploads\/sites\/2\/2019\/05\/TrafficAlertWebCard-SDN-300x187.jpg 300w\" sizes=\"auto, (max-width: 612px) 100vw, 612px\"><\/div>\n<\/figure>\n<p class=\"STND-STND BodyText\">Resurfacing of I-70 between Avon and West Vail will begin June 9, according to a news release from the Colorado Department of Transportation. Construction along the stretch of road is expected to take place from 6 p.m. to 6 a.m. Sundays through Thursdays into October.<\/p>\n<p class=\"STND-STND BodyText\">The resurfacing will increase friction on the roadway, which can help to reduce crashes. The project also will replace guardrails to improve safety in the area.<\/p>\n<p class=\"STND-STND BodyText\">Drivers should expect single-lane closures during work hours with reduced 40 mph speeds.<\/p>\n<p class=\"STND-STND BodyText\">For more information, call 970-661-3883, email <a href=\"mailto:i70avontovail@yahoo.com\">i70avontovail@yahoo.com<\/a> or visit codot.gov\/projects\/i-70-improvements-between-avon-and-vail.<\/p>\n<p><a href=\"https:\/\/www.summitdaily.com\/news\/drivers-should-expect-delays-during-i-70-avon-to-vail-paving-project\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: Summit Daily<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Resurfacing of I-70 between Avon and West Vail will begin June 9, according to a news release from the Colorado Department of Transportation. Construction along the stretch of road is expected to take place from 6 p.m. to 6 a.m. Sundays through Thursdays into October. The resurfacing will increase friction on the roadway, which can [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[97],"tags":[],"class_list":{"0":"post-24960","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-local-news"},"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-06-11 17:31:25","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KIFT - The LIFT FM","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kift","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kift\/wp-json\/wp\/v2\/posts\/24960","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kift\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kift\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kift\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kift\/wp-json\/wp\/v2\/comments?post=24960"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kift\/wp-json\/wp\/v2\/posts\/24960\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kift\/wp-json\/wp\/v2\/media?parent=24960"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kift\/wp-json\/wp\/v2\/categories?post=24960"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kift\/wp-json\/wp\/v2\/tags?post=24960"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}