{"id":25677,"date":"2019-06-19T13:04:00","date_gmt":"2019-06-19T19:04:00","guid":{"rendered":"https:\/\/www.summitdaily.com\/news\/frisco-installs-new-electric-vehicle-charging-station\/"},"modified":"2019-06-19T13:04:00","modified_gmt":"2019-06-19T19:04:00","slug":"frisco-installs-new-electric-vehicle-charging-station","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kift\/local-news\/frisco-installs-new-electric-vehicle-charging-station\/","title":{"rendered":"Frisco installs new electric vehicle charging station"},"content":{"rendered":"<figure class=\"wp-block-image\">\n<div class=\"caption-container\"><img loading=\"lazy\" decoding=\"async\" width=\"465\" height=\"620\" src=\"https:\/\/cdn.summitdaily.com\/wp-content\/uploads\/sites\/2\/2019\/06\/Brf-FriscoElectric-SDN-062019.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/cdn.summitdaily.com\/wp-content\/uploads\/sites\/2\/2019\/06\/Brf-FriscoElectric-SDN-062019.jpg 465w, https:\/\/cdn.summitdaily.com\/wp-content\/uploads\/sites\/2\/2019\/06\/Brf-FriscoElectric-SDN-062019-225x300.jpg 225w\" sizes=\"auto, (max-width: 465px) 100vw, 465px\"><figcaption><strong>A look at the new electric vehicle charging station on 3rd Avenue in Frisco.<\/strong><br \/><em>Sawyer D\u2019Argonne \/ sdargonne@summitdaily.com<\/em><\/figcaption><\/div>\n<\/figure>\n<p class=\"STND-STND BodyText\">Frisco is set to unveil a new two-port electric vehicle charging station in town, part of the town\u2019s recently adopted 100% renewable energy plan and Climate Action Plan.<\/p>\n<p class=\"STND-STND BodyText\">The ports, installed on 3rd Avenue between Main Street and Granite Street, will be switched on at a ceremony at 5 p.m. Thursday, June 20. The public is invited to the ceremony to support the sustainability efforts of the town\u2019s public works department, Green Team and town council. Following the ceremony, attendees are invited to the Frisco Historic Park for the summer\u2019s first free Concert in the Park with the Copper Children from 5:30 to 7:30 p.m.<\/p>\n<p class=\"STND-STND BodyText\">Frisco\u2019s Green Team was awarded a grant from Charge Ahead Colorado to install the multiport station in June last year. The station is available free of charge for owners of electric vehicles and should already show up on charging station location apps like Charge Point and Plug Share. In addition to the new port, Frisco also has charging stations at Whole Foods and is nearing completion on stations at Walmart.<\/p>\n<p class=\"STND-STND BodyText\">Since the first station opened last month, it has saved about 173 kilograms of greenhouse gas emissions, according to the town, the equivalent of planting four trees. Once the Walmart stations are complete, Frisco will have one charging station per 800 residents, compared with one station per 1,800 people in Denver.<\/p>\n<p><a href=\"https:\/\/www.summitdaily.com\/news\/local\/frisco-installs-new-electric-vehicle-charging-station\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: Summit Daily<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A look at the new electric vehicle charging station on 3rd Avenue in Frisco.Sawyer D\u2019Argonne \/ sdargonne@summitdaily.com Frisco is set to unveil a new two-port electric vehicle charging station in town, part of the town\u2019s recently adopted 100% renewable energy plan and Climate Action Plan. The ports, installed on 3rd Avenue between Main Street and [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[97],"tags":[],"class_list":{"0":"post-25677","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-local-news"},"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-06-12 04:36:36","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KIFT - The LIFT FM","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kift","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kift\/wp-json\/wp\/v2\/posts\/25677","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kift\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kift\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kift\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kift\/wp-json\/wp\/v2\/comments?post=25677"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kift\/wp-json\/wp\/v2\/posts\/25677\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kift\/wp-json\/wp\/v2\/media?parent=25677"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kift\/wp-json\/wp\/v2\/categories?post=25677"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kift\/wp-json\/wp\/v2\/tags?post=25677"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}