{"id":1301791,"date":"2018-12-25T15:33:01","date_gmt":"2018-12-25T22:33:01","guid":{"rendered":"https:\/\/www.vaildaily.com\/news\/eagle-increasing-water-sewer-rates-to-pay-for-second-water-treatment-plant\/"},"modified":"2018-12-25T15:33:01","modified_gmt":"2018-12-25T22:33:01","slug":"eagle-increasing-water-sewer-rates-to-pay-for-second-water-treatment-plant","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kske\/local-news\/eagle-increasing-water-sewer-rates-to-pay-for-second-water-treatment-plant\/","title":{"rendered":"Eagle increasing water, sewer rates to pay for second water treatment plant"},"content":{"rendered":"<p class=\"STND-STND BodyText\">EAGLE \u2014 Eagle&#8217;s second water treatment plant should crank up in two years; the water and sewer rate increases to pay for it will hit next month.<\/p>\n<p class=\"STND-STND BodyText\">Eagle announced the water and sewer rate increases last spring, when the town board approved building a second water treatment plant.<\/p>\n<p class=\"STND-STND BodyText\">For almost two decades, Eagle has been kicking around the idea for a second water treatment plant. Facing growth of up to 2,000 housing units in the next several years, the new water treatment plant <a id=\"N0x1ecf1b0N0x1e287a0:N0x1ecf1b0N0x1f6ae20\" href=\"https:\/\/www.vaildaily.com\/news\/eagle-breaks-ground-on-second-water-treatment-plant-it-should-accommodate-growth-for-next-20-years\/\">should accommodate growth<\/a> for at least the next two decades.<\/p>\n<p class=\"STND-STND BodyText\">That plant will cost:<\/p>\n<p class=\"STND-STND BodyText ListBullet\">\u2022 $26,705,796: Total project cost<\/p>\n<p class=\"STND-STND BodyText ListBullet\">\u2022 $23,424,732: Guaranteed maximum price of the plant itself.<\/p>\n<div id=\"single-mid-script\" class=\"p402_hide\">\n<h2>Recommended Stories For You<\/h2>\n<\/p><\/div>\n<p class=\"STND-STND BodyText ListBullet\">\u2022 $19 million: the maximum amount the town will borrow<\/p>\n<p class=\"STND-STND BodyText ListBullet\">\u2022 $10 million: Money the town has saved in a special fund.<\/p>\n<p class=\"STND-STND BodyText Subhead\">To pay for it<\/p>\n<p class=\"STND-STND BodyText\">To pay for it, the town will increase sewer rates 3 percent beginning January 21, 2019. The rate increase will show up on your February 2019 bill.<\/p>\n<p class=\"STND-STND BodyText\">Along with the sewer rate increase, the town board instituted tiered water rates. Basically, the more treated water you use, the more you&#8217;ll pay per gallon. The fee plan also adds a commercial rate. Like residential users, they&#8217;ll pay $1.50 for their first 6,000 gallons. After 6,000 gallons, commercial users will pay $6.62 for every 1,000 gallons.<\/p>\n<p class=\"STND-STND BodyText Subhead\">Why a second plant<\/p>\n<p class=\"STND-STND BodyText\">Eagle&#8217;s current plant runs at around 80 percent capacity during the peak summer lawn irrigation season. <a href=\"https:\/\/www.vaildaily.com\/news\/two-sides-staking-out-positions-in-28-million-eagles-water-plant-fight\/\" rel=\"nofollow\">https:\/\/www.vaildaily.com\/news\/two-sides-staking-out-positions-in-28-million-eagles-water-plant-fight\/<\/a><\/p>\n<p class=\"STND-STND BodyText\">The new plant would generate up to 2.5 million gallons of water per day.<\/p>\n<p class=\"STND-STND BodyText\">The Lower Basin Water Treatment Plant project will be located at the confluence of Brush Creek and the Eagle River, near Eagle&#8217;s existing water treatment plant.<\/p>\n<p class=\"STND-STND BodyText Subhead\">Conservation counts<\/p>\n<p class=\"STND-STND BodyText\">Along with the fee structure, the plan sets an aggressive goal of cutting water use by 5 percent over five years.<\/p>\n<p class=\"STND-STND BodyText\">The town&#8217;s water use in its parks is down 3 percent in the last three years, according to the town&#8217;s public works department. The town also replaced much of its leaky water pipe system, and plugging those holes saved around 20 percent.<\/p>\n<p class=\"STND-STND BodyText Tagline\">Staff Writer Randy Wyrick can be reached at 970-748-2935 and <a href=\"mailto:rwyrick@vaildaily.com\">rwyrick@vaildaily.com<\/a>.<\/p>\n<p><a href=\"https:\/\/www.vaildaily.com\/news\/eagle-increasing-water-sewer-rates-to-pay-for-second-water-treatment-plant\/\" target=\"_blank\">via:: Vail Daily<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>EAGLE \u2014 Eagle&#8217;s second water treatment plant should crank up in two years; the water and sewer rate increases to pay for it will hit next month. Eagle announced the water and sewer rate increases last spring, when the town board approved building a second water treatment plant. For almost two decades, Eagle has been [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[160],"tags":[],"class_list":{"0":"post-1301791","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-local-news"},"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-06-11 18:30:52","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSKE Ski Country","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kske","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts\/1301791","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/comments?post=1301791"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts\/1301791\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/media?parent=1301791"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/categories?post=1301791"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/tags?post=1301791"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}