{"id":1302235,"date":"2019-01-09T11:22:55","date_gmt":"2019-01-09T18:22:55","guid":{"rendered":"https:\/\/www.vaildaily.com\/?p=442136"},"modified":"2019-01-09T11:22:55","modified_gmt":"2019-01-09T18:22:55","slug":"holy-cross-energy-reaches-deal-with-guzman-energy-to-develop-wind-farm","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kske\/local-news\/holy-cross-energy-reaches-deal-with-guzman-energy-to-develop-wind-farm\/","title":{"rendered":"Holy Cross Energy reaches deal with Guzman Energy to develop wind farm"},"content":{"rendered":"<p class=\"STND-STND BodyText\">Holy Cross Energy may reach its goal of providing 70 percent renewable energy nine years ahead of schedule.<\/p>\n<p class=\"STND-STND BodyText\">In a deal with Denver-based energy wholesaler Guzman Energy, the Glenwood Springs-based HCE will develop a new wind farm to serve the Rocky Mountain region, bringing the electric cooperative to nearly 70 percent renewables by summer of 2021.<\/p>\n<p class=\"STND-STND BodyText\">\u201cWe\u2019ve contracted with Guzman to develop 100 megawatts of wind energy that will flow over the grid to our consumers here in the Roaring Fork Valley, the Glenwood Springs area, and the Eagle and Vail valleys. We\u2019re really excited about that,\u201d HCE president and CEO Bryan Hannegan said.<\/p>\n<p class=\"STND-STND BodyText\">There is no location for the plant yet, but it will likely be on the eastern side of the state.<\/p>\n<p class=\"STND-STND BodyText\">HCE anticipates the wind farm will be connected to the grid by summer of 2021. Along with other initiatives the company is working to implement, Hannegan hopes to achieve the energy goals at the same time.<\/p>\n<p class=\"STND-STND BodyText\">\u201cHopefully, we\u2019ll be able to announce that we\u2019ve achieved our 2030 goals nine years early,\u201d Hannegan said. HCE announced in September of last year its goal of reaching 70 percent renewable energy by 2030.<\/p>\n<div id=\"single-mid-script\" class=\"p402_hide\">\n<h2>Recommended Stories For You<\/h2>\n<\/p><\/div>\n<p class=\"STND-STND BodyText\">Under the power purchase agreement, HCE is to sell its shares in the coal-fired Comanche Generating Station to Guzman, and buy the company\u2019s wind power for its own grid.<\/p>\n<p class=\"STND-STND BodyText\">The power purchase agreement won\u2019t quite be a one-for-one exchange. The nature of wind energy is that, when there is no wind, power isn\u2019t being generated.<\/p>\n<p class=\"STND-STND BodyText\">\u201cWe will be buying additional power resources both from Xcel under our existing power cell agreement, and through Guzman itself to make up for some of the differences when the wind is not blowing,\u201d Hannegan said.<\/p>\n<p class=\"STND-STND BodyText\">In December,\u00a0<a id=\"N0x27a94f0N0x2644800:N0x27a94f0N0x26fd560\" class=\"\" href=\"https:\/\/www.postindependent.com\/news\/local\/xcel-energizes-western-colorado-interest-in-renewables\/\">Xcel announced its own goals to reduce emissions<\/a>\u00a0by 80 percent (from 2005 levels), also by 2030, and to reach carbon-neutral energy generation by 2050.<\/p>\n<p class=\"STND-STND BodyText\">Eventually, the overall cost of energy will go down for Rocky Mountain customers, Hannegan said.<\/p>\n<p class=\"STND-STND BodyText\">\u201cGiven the lower cost of wind when it\u2019s blowing, we\u2019ll see our power costs go down over time. It\u2019s not going to be more expensive \u2014 it\u2019s going to be less expensive as we set in our goals,\u201d Hannegan said.<\/p>\n<p class=\"STND-STND BodyText\">\u201cThis deal allows HCE to meet their renewable energy goals without increasing cost, adds more renewables to the grid in the West, and supplements Guzman\u2019s overall resource mix with reliable baseload, as needed,\u201d Jeff Heit, managing director with Guzman Energy, said in a statement. \u201cIt\u2019s another example of what can be accomplished if stakeholders work together to find innovative ways to transition to the new energy economy.\u201d<\/p>\n<p class=\"STND-STND BodyText Tagline\"><a class=\"\" href=\"mailto:tphippen@postindependent.com\">tphippen@postindependent.com<\/a><\/p>\n<p><a href=\"https:\/\/www.vaildaily.com\/news\/regional\/holy-cross-energy-reaches-deal-with-guzman-energy-to-develop-wind-farm\/\" target=\"_blank\">via:: Vail Daily<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Holy Cross Energy may reach its goal of providing 70 percent renewable energy nine years ahead of schedule. In a deal with Denver-based energy wholesaler Guzman Energy, the Glenwood Springs-based HCE will develop a new wind farm to serve the Rocky Mountain region, bringing the electric cooperative to nearly 70 percent renewables by summer of [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[160],"tags":[],"class_list":{"0":"post-1302235","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-local-news"},"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-06-12 09:33:56","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSKE Ski Country","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kske","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts\/1302235","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/comments?post=1302235"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts\/1302235\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/media?parent=1302235"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/categories?post=1302235"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/tags?post=1302235"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}