{"id":1312573,"date":"2019-07-18T16:11:22","date_gmt":"2019-07-18T22:11:22","guid":{"rendered":"https:\/\/www.postindependent.com\/?p=984244"},"modified":"2019-07-18T16:11:22","modified_gmt":"2019-07-18T22:11:22","slug":"glenwood-springs-chip-and-seal-work-continues-the-week-of-july-22","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kske\/local-news\/glenwood-springs-chip-and-seal-work-continues-the-week-of-july-22\/","title":{"rendered":"Glenwood Springs chip and seal work continues the week of July 22"},"content":{"rendered":"<figure class=\"wp-block-image p402_hide\">\n<div class=\"caption-container\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"337\" src=\"https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2019\/05\/PI-traffic-alert-small.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2019\/05\/PI-traffic-alert-small.jpg 600w, https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2019\/05\/PI-traffic-alert-small-300x169.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\"><\/div>\n<\/figure>\n<p>Beginning July 22 and through July 26, the city of Glenwood Springs will perform chip and seal work on residential streets near the downtown core.<\/p>\n<p>Work will begin on Monday and last through the week on the following streets:<\/p>\n<p>\u2022 Blake Avenue from Seventh to 13th streets<\/p>\n<p>\u2022 Bennett Avenue from Seventh to 13th streets<\/p>\n<p>\u2022 Bennett Avenue from 21st to 23rd street<\/p>\n<p>\u2022 Palmer Avenue from Seventh to 12th streets<\/p>\n<p>\u2022 Pitkin Avenue from Eighth to 14th streets<\/p>\n<p>The affected streets will remain open during the week, however parking will be impacted.<\/p>\n<p>Additionally, 27th Street east of the 27th Street Bridge to Highway 82 will be milled and overlaid from 7 a.m. to 7 p.m. July 25.<\/p>\n<p>27th Street will remain open for this work, which is slated to occur prior to the bridge closure at 7 p.m. Thursday for the 27th Street bridge construction project.<\/p>\n<p>For more information on street projects visit <a href=\"http:\/\/www.cogs.us\/streetmaintenance\" rel=\"nofollow\">http:\/\/www.cogs.us\/streetmaintenance<\/a>.<\/p>\n<p> <a href=\"https:\/\/www.postindependent.com\/news\/glenwood-springs-chip-and-seal-work-continues-the-week-of-july-22\/?\" target=\"_blank\" rel=\"noopener noreferrer\">via:: Post Independent<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Beginning July 22 and through July 26, the city of Glenwood Springs will perform chip and seal work on residential streets near the downtown core. Work will begin on Monday and last through the week on the following streets: \u2022 Blake Avenue from Seventh to 13th streets \u2022 Bennett Avenue from Seventh to 13th streets [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[160],"tags":[],"class_list":{"0":"post-1312573","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-local-news"},"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-06-20 23:47:12","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSKE Ski Country","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kske","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts\/1312573","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/comments?post=1312573"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts\/1312573\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/media?parent=1312573"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/categories?post=1312573"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/tags?post=1312573"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}