{"id":1313433,"date":"2019-08-11T09:21:57","date_gmt":"2019-08-11T15:21:57","guid":{"rendered":"https:\/\/www.postindependent.com\/?p=985771"},"modified":"2019-08-11T09:21:57","modified_gmt":"2019-08-11T15:21:57","slug":"glenwoods-summer-street-work-continues-monday-with-south-midland-paving","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kske\/local-news\/glenwoods-summer-street-work-continues-monday-with-south-midland-paving\/","title":{"rendered":"Glenwood\u2019s summer street work continues Monday with South Midland paving"},"content":{"rendered":"<figure class=\"wp-block-image p402_hide\">\n<div class=\"caption-container\"><img loading=\"lazy\" decoding=\"async\" width=\"620\" height=\"413\" src=\"https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2018\/04\/SoMidland-gpi-012618-1.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2018\/04\/SoMidland-gpi-012618-1.jpg 620w, https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2018\/04\/SoMidland-gpi-012618-1-150x100.jpg 150w, https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2018\/04\/SoMidland-gpi-012618-1-325x216.jpg 325w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\"><figcaption><strong>A seemingly permanent road damage sign sits on south Midland as traffic goes by.<\/strong><br \/><em>Post Independent file<\/em><\/figcaption><\/div>\n<\/figure>\n<p>Glenwood Springs\u2019 summer street maintenance work continues this coming week with repaving of South Midland Avenue scheduled to commence on Monday.<\/p>\n<p>Crews will conduct asphalt work on Midland Avenue south of 27th Street Monday and Tuesday, followed by additional asphalt work in the Park West neighborhood Tuesday through Thursday.<\/p>\n<p>According to a city press release, the anticipated work will require the removal and repaving of full-depth sections of the roadway.<\/p>\n<p>\u201cCrews will attempt to avoid working during peak travel times, however motorists should anticipate delays and allow extra travel time on South Midland Avenue,\u201d city officials said in the release.<\/p>\n<p>The work to be completed on South Midland will be temporary in nature, in anticipation of a full reconstruction project that is slated for 2020, according to the release.<\/p>\n<p>\u201cAll asphalt laid on [South Midland] that will be removed for the full reconstruction, will be repurposed for future street maintenance projects,\u201d the release also explained.<\/p>\n<h4>New <strong>roundabout construction begins Thursday<\/strong><\/h4>\n<p>Also this week, construction of the new roundabout at 27<sup>th<\/sup> Street and South Grand Avenue is set to begin on Thursday; part of the larger Sunlight Bridge replacement project.<\/p>\n<p>During construction, project officials advise that motorists should anticipate various shifting traffic patterns on 27<sup>th<\/sup> Street and South Grand, including narrowed driving lanes and occasional lane closures.<\/p>\n<p>Beginning Thursday, South Grand from 27<sup>th<\/sup> Street to Penrose Plaza will be closed continuously until approximately mid-September. Access to businesses along South Grand between 23<sup>rd<\/sup> and 27<sup>th<\/sup> streets will remain open via the 23<sup>rd<\/sup> Street intersection at Highway 82.<\/p>\n<p>Additionally, no left turns will be allowed from westbound 27<sup>th<\/sup> Street onto to South Grand. Anyone intending to head toward the Rosebud Cemetery area will be directed to the Midland roundabout, and to loop around and return to the intersection for a right-hand turn.<\/p>\n<p>Pedestrian and bicyclist access will remain open with some detours. Bicyclists may be asked to dismount in the construction area.<\/p>\n<p> <a href=\"https:\/\/www.postindependent.com\/news\/glenwoods-summer-street-work-continues-monday-with-south-midland-paving\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: Post Independent<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A seemingly permanent road damage sign sits on south Midland as traffic goes by.Post Independent file Glenwood Springs\u2019 summer street maintenance work continues this coming week with repaving of South Midland Avenue scheduled to commence on Monday. Crews will conduct asphalt work on Midland Avenue south of 27th Street Monday and Tuesday, followed by additional [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[160],"tags":[],"class_list":{"0":"post-1313433","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-local-news"},"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-06-24 06:34:30","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSKE Ski Country","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kske","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts\/1313433","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/comments?post=1313433"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts\/1313433\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/media?parent=1313433"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/categories?post=1313433"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/tags?post=1313433"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}