{"id":1314635,"date":"2019-09-15T18:05:13","date_gmt":"2019-09-16T00:05:13","guid":{"rendered":"https:\/\/www.postindependent.com\/?p=987551"},"modified":"2019-09-16T07:49:57","modified_gmt":"2019-09-16T13:49:57","slug":"sixth-street-roundabout-work-in-glenwood-springs-to-begin-monday","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kske\/local-news\/sixth-street-roundabout-work-in-glenwood-springs-to-begin-monday\/","title":{"rendered":"Sixth Street roundabout work in Glenwood Springs to begin Monday"},"content":{"rendered":"<figure class=\"wp-block-image p402_hide\">\n<div class=\"caption-container\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"664\" src=\"https:\/\/www.postindependent.com\/wp-content\/uploads\/sites\/6\/2019\/09\/roundabout-gpi-091019-1024x664.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/www.postindependent.com\/wp-content\/uploads\/sites\/6\/2019\/09\/roundabout-gpi-091019-1024x664.jpg 1024w, https:\/\/www.postindependent.com\/wp-content\/uploads\/sites\/6\/2019\/09\/roundabout-gpi-091019-300x194.jpg 300w, https:\/\/www.postindependent.com\/wp-content\/uploads\/sites\/6\/2019\/09\/roundabout-gpi-091019-768x498.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><figcaption><strong>The roundabout located at exit 116 and the intersection of Sixth and Laurel streets.<\/strong><br \/><em>Chelsea Self \/ Post Independent<\/em><\/figcaption><\/div>\n<\/figure>\n<p>On the heels of the Seventh Street Project\u2019s completion, local contractor Gould Construction will now start work on the Sixth Street roundabout beginning Sept. 16.<\/p>\n<p>According to a news release motorists should anticipate, \u201cperiodic lane closures and brief traffic holds\u201d in the Sixth Street and Colorado Highway 82 vicinity beginning Monday.<\/p>\n<p>Although authorized to work six days a week, Glenwood Springs City Engineer Terri Partch did not envision Gould Construction doing that.<\/p>\n<p>\u201cI think that they probably will try to hold their operations to Monday to Friday, but the contract technically allows Saturday,\u201d said Partch.<\/p>\n<p>In accordance with the city\u2019s noise ordinance, Gould Construction may work between 7 a.m. and 8 p.m. However, the contractor will attempt to avoid any lane impacts during peak travel times, Partch explained.<\/p>\n<p>\u201cThey may be working, but they will be in an island that does not affect that movement,\u201d Partch said. \u201cAs much as Gould Construction possibly can, they would like to work in one island at a time to save on traffic control costs.\u201d<\/p>\n<p>The first phase of work will run through mid-November as crews install irrigation, electrical equipment, lighting, decorative boulders, trees, sod and ornamental grasses throughout the project\u2019s site area. More than just a single roundabout, the project\u2019s perimeter includes numerous adjacent islands and the area leading up to the pedestrian underpass beneath the I-70 westbound ramp.<\/p>\n<p>The project, which council approved unanimously at its Sept. 5 meeting, carries a price tag of approximately $689,000 that will pull directly from the city\u2019s A&amp;I account.<\/p>\n<p>Significant project expenditures include: $168,500 for traffic control, roughly $149,044 for various trees, shrubs, mulch, perennials and sod, and over $100,000 for irrigation.<\/p>\n<p>The project was originally anticipated to cost $1.1 million. However, following value engineering that number was brought down to $647,423. The addition of electric hardwiring brought the final total to $689,143.<\/p>\n<p>Upon completion phase one of the project by mid-November, Gould Construction will resume work in spring 2020.<\/p>\n<p>The project has a target completion date of spring 2020 as well.<\/p>\n<p><em><a href=\"mailto:mabennett@postindependent.com\">mabennett@postindependent.com<\/a><\/em><\/p>\n<p> <a href=\"https:\/\/www.postindependent.com\/news\/sixth-street-roundabout-work-in-glenwood-springs-to-begin-monday\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: Post Independent<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The roundabout located at exit 116 and the intersection of Sixth and Laurel streets.Chelsea Self \/ Post Independent On the heels of the Seventh Street Project\u2019s completion, local contractor Gould Construction will now start work on the Sixth Street roundabout beginning Sept. 16. According to a news release motorists should anticipate, \u201cperiodic lane closures and [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[160],"tags":[],"class_list":{"0":"post-1314635","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-local-news"},"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-06-27 11:47:38","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSKE Ski Country","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kske","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts\/1314635","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/comments?post=1314635"}],"version-history":[{"count":1,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts\/1314635\/revisions"}],"predecessor-version":[{"id":1314648,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts\/1314635\/revisions\/1314648"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/media?parent=1314635"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/categories?post=1314635"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/tags?post=1314635"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}