{"id":1318301,"date":"2020-02-18T14:55:03","date_gmt":"2020-02-18T21:55:03","guid":{"rendered":"https:\/\/www.postindependent.com\/?p=993731"},"modified":"2020-02-18T14:55:03","modified_gmt":"2020-02-18T21:55:03","slug":"garfield-county-to-blm-dont-rush-environmental-review-of-quarry-water-study","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kske\/local-news\/garfield-county-to-blm-dont-rush-environmental-review-of-quarry-water-study\/","title":{"rendered":"Garfield County to BLM: Don\u2019t rush environmental review of quarry water study"},"content":{"rendered":"<figure class=\"wp-block-image p402_hide\">\n<div class=\"caption-container\"> <img loading=\"lazy\" decoding=\"async\" width=\"620\" height=\"410\" src=\"https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2018\/10\/RMR-GPI-101218-1.jpg\" class=\"attachment-large size-large wp-post-image\" alt=\"Work continues at the Rocky Mountain Resources quarry north of the Glenwood Caverns Adventure Park on a chilly and wet Thursday afternoon.\" srcset=\"https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2018\/10\/RMR-GPI-101218-1.jpg 620w, https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2018\/10\/RMR-GPI-101218-1-150x99.jpg 150w, https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2018\/10\/RMR-GPI-101218-1-325x215.jpg 325w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\"><figcaption><strong>Work continues at the Rocky Mountain Resources quarry north of the Glenwood Caverns Adventure Park on a chilly and wet Thursday afternoon.<\/strong><br \/><em>Chelsea Self \/ Post Independent<\/em><\/figcaption><\/div>\n<\/figure>\n<p>Garfield County contends the Bureau of Land Management isn\u2019t being open about the environmental assessment of proposed well drilling on RMR Industrial\u2019s quarry site grinds on.<\/p>\n<p>\u201cWe find this highly uncharacteristic of the BLM, considering that their required obligation is to alert the county to the proposed (environmental assessment), as they have done in recent history,\u201d said Fred Jarman, Garfield County manager, at a commissioners meeting Tuesday.<\/p>\n<p>The Garfield County commissioners voted unanimously to send a letter Tuesday urging the BLM\u2019s Silt field office to perform \u201ca thoughtful, thorough, and complete analysis of the potential impacts of RMR\u2019s proposal\u201d to drill test wells as part of a hydrological study.<\/p>\n<p>\u201cWe believe the BLM has an obligation \u2026 to notify the board of county commissioners that they\u2019re pursuing this, what the timeline looks like, those kinds of things,\u201d Jarman said.<\/p>\n<p>The hydrology study is required for the Environmental Impact Statement the BLM will conduct on RMR\u2019s proposed expansion of the existing limestone quarry north of Glenwood Springs.<\/p>\n<p>The city of Glenwood Springs requested to be a formal cooperating agency on the environmental assessment, meaning they are involved with decisions about the process and issues of the environmental assessment, BLM spokesman David Boyd said.<\/p>\n<p>The county could also request to be a cooperating agency, Boyd added.<\/p>\n<p>\u201cCertainly, if a local government wants to be a cooperator, we will work with them on that. It\u2019s more common on (Environmental Impact Statements), and the larger documents that take more time, and has a lot more detail,\u201d Boyd said.<\/p>\n<p>Initially, the BLM considered using a \u201ccategorical exclusion,\u201d the lowest level of environmental review, to approve the hydrological study. Due to the intense interest and controversy surrounding the quarry project, the BLM opened a public scoping process on the test wells, and <a href=\"https:\/\/www.postindependent.com\/news\/rmr-may-be-using-water-study-to-drill-exploratory-holes\/\">asked the county<\/a> to comment Sept. 25, 2019.<\/p>\n<p>\u201cSince that time, the BLM has provided no notice to Garfield County regarding their proposed process, which would typically include an invitation to the county to comment, and also a proposed timeline for decisions,\u201d Jarman said.<\/p>\n<p>After receiving 250 comments, virtually all opposed to the drilling, and getting a last-minute<a href=\"https:\/\/www.postindependent.com\/news\/tipton-asks-blm-to-conduct-environmental-assessment-on-rmr-study\/\"> letter from Rep. Scott Tipton (R-Colo.) urging caution<\/a> about potential damage to the hot springs\u2019 source waters, the BLM <a href=\"https:\/\/www.postindependent.com\/news\/blm-will-study-environmental-impact-of-quarry-wells\/\">decided to conduct the environmental assessment<\/a> in December.<\/p>\n<p>BLM guidance from June 2019 differentiates between \u201csimple\u201d and \u201ccomplex\u201d environmental assessments. The simple assessment is for routine and noncontroversial proposals, while the complex version \u201creflects a project that has more than three issues for analysis and more than one action alternative,\u201d according to the guidance.<\/p>\n<p>The county believes the quarry\u2019s drilling proposal requires the \u201ccomplex\u201d format, which usually looks at more than two options \u2014 in this case, the BLM could study the impacts of the proposed test wells, the impacts of taking no action, or other options in between.<\/p>\n<p>BLM <a href=\"https:\/\/www.doi.gov\/sites\/doi.gov\/files\/elips\/documents\/3355_-_streamlining_national_environmental_policy_reviews_and_implementation_of_executive_order_13807_establishing_discipline_and_accountability_in_the_environmental_review_and_permitting_process_for.pdf\">guidance from Interior Secretary David Bernhardt in 2017<\/a> set a target of 90 days for environmental assessment. But according to Boyd, the BLM considers the start date of the current environmental assessment was in September when the categorical exclusion process was announced, so the 90-day target has already been exceeded.<\/p>\n<p>The county also asked the BLM to receive more public comments, in part due to the recently discovered cave known as Witches\u2019 Pantry that was not publicized before the scoping period.<\/p>\n<p>According to Boyd, a draft environmental assessment would not necessarily require another round of public comments.<\/p>\n<p>\u201cOften with an environmental assessment like this we wouldn\u2019t put it back out for public comment, because we scoped the proposal,\u201d Boyd said.<\/p>\n<p>Boyd declined to give a timeline for the completion of a draft environmental assessment for the test wells.<\/p>\n<p>In addition to the hydrological study, the BLM also needs to complete a cave\/karst report, an ethnographic study, and a mineral examination before the environmental impact statement on the larger expansion proposal begins.<\/p>\n<p>\u201cIt\u2019s really hard to estimate when we would start the (environmental impact statement) with scoping given all these other things that need to be completed,\u201d Boyd said.<\/p>\n<p>There\u2019s a possibility that the scoping could begin in late 2020, Boyd said. \u201cIt could be possible then, but it might be later than that,\u201d Boyd said.<\/p>\n<p><em><a href=\"mailto:tphippen@postindependent.com\">tphippen@postindependent.com<\/a><\/em><\/p>\n<p><a href=\"https:\/\/www.postindependent.com\/news\/garfield-county-to-blm-dont-rush-environmental-review-of-quarry-water-study\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: Post Independent<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Work continues at the Rocky Mountain Resources quarry north of the Glenwood Caverns Adventure Park on a chilly and wet Thursday afternoon.Chelsea Self \/ Post Independent Garfield County contends the Bureau of Land Management isn\u2019t being open about the environmental assessment of proposed well drilling on RMR Industrial\u2019s quarry site grinds on. \u201cWe find this [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[160],"tags":[],"class_list":["post-1318301","post","type-post","status-publish","format-standard","category-local-news"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-09-05 18:41:39","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSKE Ski Country","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kske","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts\/1318301","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/comments?post=1318301"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts\/1318301\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/media?parent=1318301"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/categories?post=1318301"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/tags?post=1318301"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}