{"id":1318434,"date":"2020-02-26T14:52:58","date_gmt":"2020-02-26T21:52:58","guid":{"rendered":"https:\/\/www.postindependent.com\/?p=994037"},"modified":"2020-02-26T14:52:58","modified_gmt":"2020-02-26T21:52:58","slug":"rifle-moves-ahead-with-downtown-plans","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kske\/local-news\/rifle-moves-ahead-with-downtown-plans\/","title":{"rendered":"Rifle moves ahead with downtown plans"},"content":{"rendered":"<figure class=\"wp-block-image p402_hide\">\n<div class=\"caption-container\"> <img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"610\" src=\"https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-1-1024x610.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-1-1024x610.jpg 1024w, https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-1-300x179.jpg 300w, https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-1-768x457.jpg 768w, https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-1-1536x914.jpg 1536w, https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-1-2048x1219.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><figcaption><strong>An overview of the slated project in downtown Rifle shows the work that will be done on Railroad Avenue from Second to Fifth Street and from East Avenue to West Avenue on Third Street.<\/strong><br \/><em><\/em><\/figcaption><\/div>\n<\/figure>\n<p>After presenting three reconstruction concepts and receiving public feedback, the city of Rifle now has a final plan for next year\u2019s downtown project.<\/p>\n<p>The project is driven by the need to fix poor drainage on Railroad Avenue and Third Street.&nbsp;<\/p>\n<p>Craig Spaulding, city of Rifle civil engineer, said storm drain pipes under the road have holes in them, which cause ruts in the road.<\/p>\n<p>\u201cBecause of the importance of Railroad Avenue and Third Street to Rifle we are trying to be a little proactive and not wait for it to completely fail,\u201d Spaulding said.<\/p>\n<p>To help with costs later down the road the city is planning to replace all utilities including the waterline, which isn\u2019t expected to fail but is near the end of its life expectancy.&nbsp;<\/p>\n<p>\u201cWe are going to replace it now so it is on the same cycle as the road and the sidewalk, so we are not tearing into what we build now,\u201d Spaulding said.<\/p>\n<p>The city used feedback from a resident survey in the final design, which they presented at the end of January.<\/p>\n<div class=\"p402_hide\">\n<figure class=\"wp-block-image size-large\">\n<div class=\"caption-container\"><img decoding=\"async\" src=\"https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-2-1024x515.jpg\" alt class=\"wp-image-994039\" srcset=\"https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-2-1024x515.jpg 1024w, https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-2-300x151.jpg 300w, https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-2-768x386.jpg 768w, https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-2-1536x772.jpg 1536w, https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-2.jpg 1667w\" sizes=\"(max-width: 1024px) 100vw, 1024px\"><figcaption><strong>The new design for Third Street includes a curbless design using bollards to seperate parking from predestrian space. To help extend the life of the project conrete will be used for the parking and asphalt will be used on the driving surface.<\/strong><br \/><em>ThirdStreet-rct-022720-2<\/em><\/figcaption><\/div>\n<\/figure>\n<\/div>\n<p>\u201cBased off of that, people were excited about the landscaping and beautifications, but didn\u2019t want to sacrifice parking,\u201d Spaulding said. \u201cWith that we scaled it back, actually gaining spots to the original plans by moving things around.\u201d<\/p>\n<p>The old parking downtown was at a 60-degree angle, which is not to code by city of Rifle standards.<\/p>\n<p>Over the holidays the city reset the parking lines to a 45-degree angle.<\/p>\n<p>Changing to the 45-degrees gives approximately 2 feet more width, which gives retailers area for signage, and more room for street design.&nbsp;<\/p>\n<p>\u201cIn doing it you can actually stay in your lane and park, whereas before you had to take up both lanes to get in and out of the spots,\u201d Spaulding said.<\/p>\n<p>With the new parking, Third Street loses a total of 30 parking spaces, which is 10-16 less than with the original concepts.<\/p>\n<div class=\"p402_hide\">\n<figure class=\"wp-block-image size-large\">\n<div class=\"caption-container\"><img decoding=\"async\" src=\"https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-3-1024x598.jpg\" alt class=\"wp-image-994040\" srcset=\"https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-3-1024x598.jpg 1024w, https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-3-300x175.jpg 300w, https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-3-768x448.jpg 768w, https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-3-1536x897.jpg 1536w, https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-3.jpg 1667w\" sizes=\"(max-width: 1024px) 100vw, 1024px\"><figcaption><strong>A view of the intersection of Railroad Avenue and Third Street shows the predestrian accessibility and outside sitting areas planned for West side of Third.<\/strong><br \/><em>ThirdStreet-rct-022720-3<\/em><\/figcaption><\/div>\n<\/figure>\n<\/div>\n<p>\u201cThere was a lot of concern at first because of the parking, we\u2019ve addressed that and people who had concerns about the parking are now more on board with the plan,\u201d Greater Rifle Improvement Team Manager Kim Burner said. \u201cThey understand that we have to make it 45-degree parking, now that\u2019s the only real place we are losing parking.\u201d<\/p>\n<p>The city will go with a curbless design with the new plan, giving the corridor more flexibility for the present and the future of downtown.<\/p>\n<p>Currently drainage goes into a curb near the sidewalk, and pools up where businesses have to go out and shovel it to prevent water and ice issues.<\/p>\n<p>\u201cBy draining it toward the street we get rid of the curb, which makes it accessible for everybody for the entire block,\u201d Spaulding said. \u201cIt will also put all the ice and buildup on the edge of the street where snow plows or sweepers can run, lowering the maintenance and improving accessibility.\u201d<\/p>\n<p>Burner added that with the new plan it offers a versatility that gives businesses outdoor seating in the summer and more parking in the winter.<\/p>\n<p>Both Spaulding and Burner said this was a major concern for many citizens and businesses.<\/p>\n<p>\u201cIt is really thinking forward that what works today, may not be what the citizens want in 10 years,\u201d Burner said.<\/p>\n<p>\u201cThis plan gives the flexibility to be whatever people want in the future without having to tear it all up and do it again.\u201d<\/p>\n<div class=\"p402_hide\">\n<figure class=\"wp-block-image size-large\">\n<div class=\"caption-container\"><img decoding=\"async\" src=\"https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-4-1024x635.jpg\" alt class=\"wp-image-994041\" srcset=\"https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-4-1024x635.jpg 1024w, https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-4-300x186.jpg 300w, https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-4-768x476.jpg 768w, https:\/\/cdn.postindependent.com\/wp-content\/uploads\/sites\/6\/2020\/02\/ThirdStreet-rct-022720-4.jpg 1500w\" sizes=\"(max-width: 1024px) 100vw, 1024px\"><figcaption><strong>The built in flexibilty of the design allows for summer seating areas to be transformed in to winter parking on Third Street.<\/strong><br \/><em>ThirdStreet-rct-022720-4<\/em><\/figcaption><\/div>\n<\/figure>\n<\/div>\n<p>The city just completed a project called potholing, which helps locate utilities to help speed up the process and keeps construction delays to a minimum when the project does begin next year.<\/p>\n<p>\u201cThe utilities were put in in the late \u201970s and \u201980s during the first big gas boom here, it was all put in really quickly. By finding it now it makes it faster when we are doing the actual construction, so we are disrupting business less,\u201d Burner said.<\/p>\n<p>Spaulding said he is currently working on finishing grant application for both the Department of Local Affairs and Federal Mineral Lease District for the project, which is estimated to cost $4.5 million, which would replace everything.&nbsp;<\/p>\n<p>The city plans to save some projects that can wait, to be practical with the budget.<\/p>\n<p>Spaulding said most of the money will come from grants. Out of the $4.5 million, $800,000 will come from the street improvement fund.<\/p>\n<p>\u201cThere is a lot of work to be done with the Xcel utilities, and Xcel actually covering that, so we are undergrounding some of the power lines,\u201d Spaulding said.<\/p>\n<p>The city won\u2019t know about the local affairs grant until July of this year, so the project is slated for spring 2021.<\/p>\n<p>\u201cWe will wait until we get all of our grants. There might be some backbone work that goes in this fall,\u201d Spaulding said.<\/p>\n<p>The city plans to improve the parking lot between the Rifle House and West Second Street on Railroad Avenue, which will add 15 spaces to parking downtown.<\/p>\n<p>During construction, parking will be detoured to the lot as the city plans closures in quarter- or half-block parcels when crews are doing the construction next year.<\/p>\n<p>The city is also adding spots on Fifth Street and is talking with the owners of the Be Healthy Stay Fit Bistro at the corner of Railroad Avenue and Fifth Street to use their parking lot after hours, which would create more than 20 additional parking spaces for downtown events.<\/p>\n<p>\u201cIt will be as early in the spring as we can start. We want to do it during the mud season when business is slowest. Try to get everything that is going to be impactful done before tourism starts coming in,\u201d Spaulding said.<\/p>\n<p>\u201cIt\u2019s kind of weather dependent in Colorado, but as early as we can based on the weather, with work extending into the summer.\u201d<\/p>\n<p><em><a href=\"mailto:kmills@postindependent.com\">kmills@postindependent.com<\/a><\/em><\/p>\n<p><a href=\"https:\/\/www.postindependent.com\/news\/rifle-moves-ahead-with-downtown-plans\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: Post Independent<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>An overview of the slated project in downtown Rifle shows the work that will be done on Railroad Avenue from Second to Fifth Street and from East Avenue to West Avenue on Third Street. After presenting three reconstruction concepts and receiving public feedback, the city of Rifle now has a final plan for next year\u2019s [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[160],"tags":[],"class_list":{"0":"post-1318434","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-local-news"},"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-06-27 20:02:58","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSKE Ski Country","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kske","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts\/1318434","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/comments?post=1318434"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/posts\/1318434\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/media?parent=1318434"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/categories?post=1318434"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kske\/wp-json\/wp\/v2\/tags?post=1318434"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}