{"id":2441920,"date":"2019-03-20T00:00:00","date_gmt":"2019-03-20T06:00:00","guid":{"rendered":"https:\/\/www.aspentimes.com\/?p=302110"},"modified":"2019-03-20T00:00:00","modified_gmt":"2019-03-20T06:00:00","slug":"night-work-road-closures-ahead-for-aspen-offices","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kspn\/local-news\/night-work-road-closures-ahead-for-aspen-offices\/","title":{"rendered":"Night work, road closures ahead for Aspen offices"},"content":{"rendered":"<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"620\" height=\"465\" src=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/03\/Cityoffices-atd-032019.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/03\/Cityoffices-atd-032019.jpg 620w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/03\/Cityoffices-atd-032019-300x225.jpg 300w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\"><figcaption><strong>Construction workers cut into the roof over the Rio Grande parking garage entrance as part of night work that will occur through Thursday.<\/strong><br \/>Carolyn Sackariason\/The Aspen Times<\/figcaption><\/figure>\n<p class=\"STND-STND BodyText\">Impacts of the new Aspen city offices on Rio Grande Place will be felt 24-7 for the foreseeable future as night work has begun and the road off of Mill Street will be closed beginning April 1.<\/p>\n<p class=\"STND-STND BodyText\">From 6 p.m. to 6 a.m., crews are working with floodlights on and heavy equipment through Thursday to complete overhead work at the lower level entrance and exit of the Rio Grande parking garage, according to Kathleen Wanatowicz, public information officer for the project.<\/p>\n<p class=\"STND-STND BodyText\">She explained to a large group during a community meeting Tuesday that the garage will remain open with some detours. There may be short holds and delays while exiting the garage during the evening.<\/p>\n<p class=\"STND-STND BodyText\">The lower level entrance will be closed, so motorists are being asked to use the Mill Street ramp to enter the garage.<\/p>\n<p class=\"STND-STND BodyText\">The work is being done to prepare for the city to build a <a id=\"N0x1279690N0x1410e90:N0x1279690N0x1422590\" href=\"https:\/\/www.aspentimes.com\/news\/aspen-city-offices-get-first-5m-for-intial-work\/\">37,500-square-foot building<\/a> where the old Aspen Chamber Resort Association stood.<\/p>\n<p class=\"STND-STND BodyText\">Rio Grande Place will be shut down to traffic beginning April from North Mill Street. Motorists wanting to enter the garage will be routed from the east side off of Spring Street, according to city officials.<\/p>\n<p class=\"STND-STND BodyText\">Then in May, Rio Grande Place will be open to traffic but the east side near the recycling center will be closed and traffic to the garage will come in from the west side.<\/p>\n<p class=\"STND-STND BodyText\">The road closures are a result of utility work that needs to be done to serve the new building.<\/p>\n<p class=\"STND-STND BodyText\">The Galena Street Shuttle stop will be relocated to in front of Locals Corner at the intersection of Main and Galena streets starting April 1. Currently, it picks people up in front of the garage entrance on Rio Grande Place.<\/p>\n<p class=\"STND-STND BodyText\">Those who want to use Rio Grande Park are encouraged to drop people off in the garage across the street; the first 20 minutes are free to motorists.<\/p>\n<p class=\"STND-STND BodyText\">Park users also can use the old power plant location on the north side of Rio Grande Park to drop off users of the open space.<\/p>\n<p class=\"STND-STND BodyText\">Taster\u2019s Pizza will remain open for the summer.<\/p>\n<p class=\"STND-STND BodyText\">Also on Tuesday, Aspen City Council signed off on using <a id=\"N0x1279690N0x1410fb0:N0x1279690N0x1422aa0\" href=\"https:\/\/www.aspentimes.com\/news\/local\/aspen-considers-how-to-finance-new-city-office-building\/\">certificates of participation<\/a> to fund the project, which is estimated to cost $30.5 million.<\/p>\n<p class=\"STND-STND BodyText\">The city will receive $30.6 million and have a payback of $33 million using a 3.78 percent borrowing interest rate, according to Pete Strecker, city finance director.<\/p>\n<p class=\"STND-STND BodyText\">\u201cThat is a historically low rate for us,\u201d he told council. \u201cThe cost of borrowing is advantageous for us.\u201d<\/p>\n<p class=\"STND-STND BodyText\">The other pieces of the entire city offices project include a $14 million renovation and remodel of the current City Hall, as well as $1.2 million for renovation of the existing Rio Grande building where Taster\u2019s and the city\u2019s Parking Department is located.<\/p>\n<p class=\"STND-STND BodyText\">During construction, the Parking Department will move to the city\u2019s North Mill Street location where the engineering and building departments are.<\/p>\n<p class=\"STND-STND BodyText Tagline\"><a href=\"mailto:csackariason@aspentimes.com\">csackariason@aspentimes.com<\/a><\/p>\n<p><a href=\"https:\/\/www.aspentimes.com\/news\/local\/night-work-road-closures-coming-for-new-city-office-project\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: The Aspen Times<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction workers cut into the roof over the Rio Grande parking garage entrance as part of night work that will occur through Thursday.Carolyn Sackariason\/The Aspen Times Impacts of the new Aspen city offices on Rio Grande Place will be felt 24-7 for the foreseeable future as night work has begun and the road off of [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49],"tags":[],"class_list":{"0":"post-2441920","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-local-news"},"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-06-15 14:14:32","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSPN The Valley&#039;s Quality Rock","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kspn","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2441920","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/comments?post=2441920"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2441920\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/media?parent=2441920"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/categories?post=2441920"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/tags?post=2441920"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}