{"id":2445302,"date":"2019-06-13T17:44:00","date_gmt":"2019-06-13T23:44:00","guid":{"rendered":"https:\/\/www.aspentimes.com\/news\/construction-yields-for-partying-in-aspen-this-weekend\/"},"modified":"2019-06-13T17:44:00","modified_gmt":"2019-06-13T23:44:00","slug":"construction-yields-for-partying-in-aspen-this-weekend","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kspn\/local-news\/construction-yields-for-partying-in-aspen-this-weekend\/","title":{"rendered":"Construction yields for partying in Aspen this weekend"},"content":{"rendered":"<figure class=\"wp-block-image\">\n<div class=\"caption-container\"><img loading=\"lazy\" decoding=\"async\" width=\"620\" height=\"465\" src=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/06\/Foodandwineconstruction-atd-061419-1.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/06\/Foodandwineconstruction-atd-061419-1.jpg 620w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/06\/Foodandwineconstruction-atd-061419-1-300x225.jpg 300w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\"><figcaption><strong>Workers put some final touches on Rio Grande Place Friday morning. The road opened Wednesday night after being partially shut down for more than a month due to construction on the city of Aspen&#8217;s new municipal office building.<\/strong><br \/><em>Carolyn Sackariason\/The Aspen Times<\/em><\/figcaption><\/div>\n<\/figure>\n<p class=\"STND-STND BodyText\">Dozens of construction workers have abandoned their projects in Aspen\u2019s central core so as to not disrupt the revelry that is the Food &amp; Wine Classic this weekend.<\/p>\n<p class=\"STND-STND BodyText\">\u201cEverything is buttoned up,\u201d said City Engineer Trish Aragon, who said it\u2019s been stressful for crews trying to get their work done with a snowy and wet spring.<\/p>\n<p class=\"STND-STND BodyText\">Friday morning, Trish and her team will be checking construction sites to make sure they are complying with the city\u2019s rule of no construction activity during Food &amp; Wine weekend.<\/p>\n<p class=\"STND-STND BodyText\">\u201cWe do our final sweep and look for people who aren\u2019t supposed to be working,\u201d she said.<\/p>\n<p class=\"STND-STND BodyText\">Food &amp; Wine is the only Aspen-centric \u201choliday\u201d that falls under the no-construction activity rule in the central core. Work also ceases for national holidays and the weeks between Christmas and New Years.<\/p>\n<p class=\"STND-STND BodyText\">\u201cIt\u2019s unique to this town,\u201d Aragon said.<\/p>\n<p class=\"STND-STND BodyText\">The city has one of the largest and most impactful projects in town right now. Work on the new 37,500-square-foot municipal <a id=\"N0x1413cf0N0x13048b0:N0x1413cf0N0x140c080\" href=\"https:\/\/www.aspentimes.com\/news\/local\/city-of-aspen-office-projects-totaling-48-1m-approved\/\">office building<\/a> has had a portion of Rio Grande Place closed for more than a month.<\/p>\n<p class=\"STND-STND BodyText\">On Wednesday evening, it was opened in both directions in preparation for Food and Wine\u2019s 5K charity run, which starts and finishes in Rio Grande Park on Friday morning.<\/p>\n<p class=\"STND-STND BodyText\">Come Monday, motorists should anticipate a lane closure on Rio Grande Place (alternating one way) for approximately a week while crews work on electric tie-in. After that, Rio Grande Place is expected to be open with minor interruptions depending on construction work activities until July 8.<\/p>\n<p class=\"STND-STND BodyText\">Rio Grande Place and Mill Street, the latter of which is the second busiest road in town, have been ripped up just about every year for the past seven, causing major headaches for motorists and pedestrians for months on end.<\/p>\n<p class=\"STND-STND BodyText\">There have more than been <a id=\"N0x1413cf0N0x1304910:N0x1413cf0N0x140c350\" href=\"https:\/\/www.aspentimes.com\/trending\/aspen-is-a-city-under-siege-with-construction-projects-torn-up-roads\/\">45 permits pulled<\/a> for work being done in the right-of-way on Mill Street since 2010, according to the city\u2019s engineering department.<\/p>\n<p class=\"STND-STND BodyText\">Roughly half of them have been city-initiated projects, including storm water work to keep the river free of pollution and water-line replacements, along with more intensive ones such as the multi-year effort to improve sidewalks, crossings and bike lanes, and the overhaul of Galena Plaza, which closed Mill Street for a portion of 2016.<\/p>\n<p class=\"STND-STND BodyText\">Couple all that with major construction projects, including the renovation and expansion of the library, a new Jerome Professional building, the expansion of the Hotel Jerome, and new administrative buildings for Pitkin County and the Aspen Police Department.<\/p>\n<p class=\"STND-STND BodyText\">The area is being impacted again \u2014 for the next two years \u2014 as the city builds its new office building and renovates the adjacent Rio Grande building.<\/p>\n<p class=\"STND-STND BodyText\">Other city projects that were put on hold for this weekend, or have been completed, involve pedestrian improvements.<\/p>\n<p class=\"STND-STND BodyText\">The intersection of Spring and Main streets, where the city is putting in a new crosswalk and rapid flash system, is nearly complete.<\/p>\n<p class=\"STND-STND BodyText\">Landscaping and the installation of the rapid flash will occur after Food &amp; Wine weekend.<\/p>\n<p class=\"STND-STND BodyText\">\u201cBut you can cross safely and once the rapid flash is in it will be even more safer,\u201d Aragon said.<\/p>\n<p class=\"STND-STND BodyText\">Aragon said removing the steps on the northwest corner of South Aspen Street and Hopkins Avenue might be the best improvement the city made this spring.<\/p>\n<p class=\"STND-STND BodyText\">\u201cIt\u2019s awesome,\u201d she said. \u201cNo more strollers going up the middle of Hopkins.\u201d<\/p>\n<p class=\"STND-STND BodyText\"><a href=\"mailto:csackariason@aspentimes.com\">csackariason@aspentimes.com<\/a><\/p>\n<p><a href=\"https:\/\/www.aspentimes.com\/news\/local\/construction-yields-for-partying-in-aspen-this-weekend\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: The Aspen Times<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Workers put some final touches on Rio Grande Place Friday morning. The road opened Wednesday night after being partially shut down for more than a month due to construction on the city of Aspen&#8217;s new municipal office building.Carolyn Sackariason\/The Aspen Times Dozens of construction workers have abandoned their projects in Aspen\u2019s central core so as [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49],"tags":[],"class_list":["post-2445302","post","type-post","status-publish","format-standard","category-local-news"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-08-22 03:36:42","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSPN The Valley&#039;s Quality Rock","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kspn","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2445302","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/comments?post=2445302"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2445302\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/media?parent=2445302"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/categories?post=2445302"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/tags?post=2445302"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}