{"id":2446500,"date":"2019-07-18T20:24:01","date_gmt":"2019-07-19T02:24:01","guid":{"rendered":"https:\/\/www.aspentimes.com\/news\/basalt-prepares-to-undertake-major-road-projects-on-midland-avenue-and-willits-lane\/"},"modified":"2019-07-18T20:24:01","modified_gmt":"2019-07-19T02:24:01","slug":"basalt-prepares-to-undertake-major-road-projects-on-midland-avenue-and-willits-lane","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kspn\/local-news\/basalt-prepares-to-undertake-major-road-projects-on-midland-avenue-and-willits-lane\/","title":{"rendered":"Basalt prepares to undertake major road projects on Midland Avenue and Willits Lane"},"content":{"rendered":"<figure class=\"wp-block-image p402_hide\">\n<div class=\"caption-container\"><img loading=\"lazy\" decoding=\"async\" width=\"620\" height=\"401\" src=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/07\/conezone-atd-0718191.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/07\/conezone-atd-0718191.jpg 620w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/07\/conezone-atd-0718191-300x194.jpg 300w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\"><figcaption><strong>The intersection at Two Rivers Road and Midland Avenue in Basalt will be closed from Monday morning until Tuesday afternoon for repavement. Detours will be in place to access downtown businesses.<\/strong><br \/><em>Scott Condon\/The Aspen Times<\/em><\/figcaption><\/div>\n<\/figure>\n<p class=\"STND-STND BodyText\">It\u2019s cone-zone time in Basalt.<\/p>\n<p class=\"STND-STND BodyText\">Two road repavement projects will be undertaken later this month on busy arteries in town.<\/p>\n<p class=\"STND-STND BodyText\">The intersection at Two Rivers Road and Midland Avenue will be closed from Monday morning until Tuesday afternoon. Downtown businesses will be open and detours will provide access. Traffic coming from downvalley on Two Rivers Road will use Midland Spur to access downtown. Traffic coming from upvalley will be directed from Two Rivers Road onto Cottonwood Drive. There will be no access to downtown via the roundabout on Basalt Avenue.<\/p>\n<p class=\"STND-STND BodyText\">While planning the project, town staff figured a closure on a Monday evening would be preferred over busier evenings later in the week.<\/p>\n<p class=\"STND-STND BodyText\">\u201cStaff has been notifying businesses of the closure and we have been fielding a number of calls,\u201d Town Manager Ryan Mahoney wrote in a recent report to the Town Council. \u201cMainly we are being asked why would do these improvements now instead of waiting until the offseason.\u201d<\/p>\n<p class=\"STND-STND BodyText\">The town determined it could not shut down the intersection while school is in session, Mahoney said. Weather also played a role in the timing. Wet, cold weather throughout the spring delayed contractors\u2019 schedules. The town also had to coordinate the roadwork with the completion of widening sidewalks on Cottonwood Drive. It didn\u2019t want to divert traffic onto Cottonwood while that project was ongoing.<\/p>\n<p class=\"STND-STND BodyText\">Addition parking will be available on Two Rivers Road west of downtown by the river park for access to businesses in Gold Rivers Court. Parking will also be available at the Basalt Elementary School.<\/p>\n<p class=\"STND-STND BodyText\">The town\u2019s contractor will roto-mill the existing surface on Two Rivers Road from the intersection to the Fryingpan Bridge by 7-Eleven, according to Mahoney. It will receive a two-inch overlay.<\/p>\n<p class=\"STND-STND BodyText\">\u201cThe intersection has started to deteriorate, especially during the winter when we dealt with a number of potholes,\u201d Mahoney wrote in his report. \u201cIf we do not keep on top of these repairs, it is likely that a costlier and longer duration project would be needed in the future.\u201d<\/p>\n<p class=\"STND-STND BodyText\">By closing the intersection, it can be limited to one evening only, according to Mahoney.<\/p>\n<p class=\"STND-STND BodyText\">On the western end of town, there will be roto-milling and repaving on Willits Lane July 24-26. The work will occur on the eastern and western ends of the busy, horseshoe-shaped route.<\/p>\n<p class=\"STND-STND BodyText\">The work will target about 550 feet off Highway 82 on the eastern end and about 1,280 feet on the western end from the roundabout to Lewis Lane. Detours will be in place.<\/p>\n<p><a href=\"https:\/\/www.aspentimes.com\/news\/local\/basalt-prepares-to-undertake-major-road-projects-on-midland-avenue-and-willits-lane\/?\" target=\"_blank\" rel=\"noopener noreferrer\">via:: The Aspen Times<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The intersection at Two Rivers Road and Midland Avenue in Basalt will be closed from Monday morning until Tuesday afternoon for repavement. Detours will be in place to access downtown businesses.Scott Condon\/The Aspen Times It\u2019s cone-zone time in Basalt. Two road repavement projects will be undertaken later this month on busy arteries in town. The [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49],"tags":[],"class_list":{"0":"post-2446500","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-local-news"},"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-06-21 15:02:49","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSPN The Valley&#039;s Quality Rock","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kspn","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2446500","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/comments?post=2446500"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2446500\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/media?parent=2446500"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/categories?post=2446500"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/tags?post=2446500"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}