{"id":2447962,"date":"2019-08-25T18:24:00","date_gmt":"2019-08-26T00:24:00","guid":{"rendered":"https:\/\/www.aspentimes.com\/news\/delays-expected-monday-due-to-roundabout-repavement\/"},"modified":"2019-08-25T18:24:00","modified_gmt":"2019-08-26T00:24:00","slug":"delays-expected-monday-due-to-roundabout-repavement","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kspn\/local-news\/delays-expected-monday-due-to-roundabout-repavement\/","title":{"rendered":"Delays expected Monday due to roundabout repavement"},"content":{"rendered":"<figure class=\"wp-block-image p402_hide\">\n<div class=\"caption-container\"><img loading=\"lazy\" decoding=\"async\" width=\"620\" height=\"349\" src=\"https:\/\/www.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/08\/roundabout-atd-082619.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/www.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/08\/roundabout-atd-082619.jpg 620w, https:\/\/www.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/08\/roundabout-atd-082619-300x169.jpg 300w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\"><figcaption><strong>A file photo of the pothole on the Highway 82 roundabout near Maroon Creek and Castle Creek roads transportation crews worked to repair in March 2019.<\/strong><br \/><em>File photo\/The Aspen Times<\/em><\/figcaption><\/div>\n<\/figure>\n<p class=\"STND-STND BodyText\">Colorado Department of Transportation crews are set to repave the eastbound lane of Highway 82 in the Maroon Creek and Castle Creek roundabout Monday morning, transportation officials announced Friday.<\/p>\n<p class=\"STND-STND BodyText\">The paving operation will begin at 10 a.m. and should be completed by early afternoon. Delays should be expected, officials said in a news release.<\/p>\n<p class=\"STND-STND BodyText\">\u201cAs busy as Aspen traffic is, it\u2019s tough to ever find a good time to make these repairs,\u201d said Tim Holbrook, CDOT transportation supervisor in a statement.<\/p>\n<p class=\"STND-STND BodyText\">Repavement projects have been completed in the roundabout area over the past three years, including in July 2018 <a id=\"N0x225fec0N0x219aae0:N0x225fec0N0x2200878\" href=\"https:\/\/www.aspentimes.com\/news\/highway-82-paving-from-aspen-business-center-to-roundabout-begins-monday\/\">when crews repaved Highway 82 between the Aspen Business Center and the roundabout.<\/a><\/p>\n<p class=\"STND-STND BodyText\">Most recently in March, <a id=\"N0x225fec0N0x219ab40:N0x225fec0N0x2200950\" href=\"https:\/\/www.aspentimes.com\/news\/local\/snow-wet-weather-permeating-pothole-problem\/\">Aspen city crews worked to repair a large pothole in the roundabout,<\/a> which was created by and difficult to fix because of wet, snowy weather.<\/p>\n<p class=\"STND-STND BodyText\">Holbrook said in the Friday news release he feels this year\u2019s late-Aug. project will help strengthen the roundabout pavement for the winter season.<\/p>\n<p class=\"STND-STND BodyText\">\u201cOur goal is to shore up the asphalt in the roundabout before winter gets here because we know how tough winter conditions are on the pavement in that spot,\u201d Holbrook said in a statement.<\/p>\n<p class=\"STND-STND BodyText\">On Monday morning, traffic will be directed around the repaving operation by flaggers and delays should be expected at both Maroon Creek Road and Castle Creek Road.<\/p>\n<p class=\"STND-STND BodyText\">Locals are encouraged to use alternate routes into Aspen, the news release stated.<\/p>\n<p><a href=\"https:\/\/www.aspentimes.com\/news\/delays-expected-monday-due-to-roundabout-repavement\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: The Aspen Times<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A file photo of the pothole on the Highway 82 roundabout near Maroon Creek and Castle Creek roads transportation crews worked to repair in March 2019.File photo\/The Aspen Times Colorado Department of Transportation crews are set to repave the eastbound lane of Highway 82 in the Maroon Creek and Castle Creek roundabout Monday morning, transportation [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49],"tags":[],"class_list":["post-2447962","post","type-post","status-publish","format-standard","category-local-news"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-08-20 15:09:33","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSPN The Valley&#039;s Quality Rock","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kspn","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2447962","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/comments?post=2447962"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2447962\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/media?parent=2447962"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/categories?post=2447962"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/tags?post=2447962"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}