{"id":2448212,"date":"2019-08-31T12:48:02","date_gmt":"2019-08-31T18:48:02","guid":{"rendered":"https:\/\/www.aspentimes.com\/news\/i-70-construction-in-glenwood-canyon-set-for-spring\/"},"modified":"2019-08-31T12:48:02","modified_gmt":"2019-08-31T18:48:02","slug":"i-70-construction-in-glenwood-canyon-set-for-spring","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kspn\/local-news\/i-70-construction-in-glenwood-canyon-set-for-spring\/","title":{"rendered":"I-70 construction in Glenwood Canyon set for spring"},"content":{"rendered":"<figure class=\"wp-block-image p402_hide\">\n<div class=\"caption-container\"><img loading=\"lazy\" decoding=\"async\" width=\"620\" height=\"413\" src=\"https:\/\/www.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/08\/Canyonwork-gpi-082819-1.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/www.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/08\/Canyonwork-gpi-082819-1.jpg 620w, https:\/\/www.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/08\/Canyonwork-gpi-082819-1-300x200.jpg 300w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\"><figcaption><strong>Interstate 70 in Glenwood Canyon at No Name, just east of Glenwood Springs.<\/strong><br \/><em>Chelsea Self\/Glenwood Springs Post Independent<\/em><\/figcaption><\/div>\n<\/figure>\n<p class=\"STND-STND BodyText\">Starting in spring 2020, the Colorado Department of Transportation (CDOT) will begin extensive roadwork on Interstate 70 westbound between the Hanging Lake and No Name tunnels.<\/p>\n<p class=\"STND-STND BodyText\">The project, likely to start in early April and scheduled to last until October 2020, will resurface I-70 westbound and upgrade curb ramps in four phases.<\/p>\n<p class=\"STND-STND BodyText\">The preliminary plan would close I-70\u2019s westbound deck in Glenwood Canyon completely for the duration of the project.<\/p>\n<p class=\"STND-STND BodyText\">\u201cThe earlier phases of this project will be done under what we call a \u2018two-way, head-to-head traffic detour,\u2019\u201d said Todd Ipsen, CDOT project manager.<\/p>\n<p class=\"STND-STND BodyText\">\u201cWhat that means is, traffic from the westbound deck is going to be detoured in one direction onto the eastbound deck.<\/p>\n<p class=\"STND-STND BodyText\">\u201cThe eastbound deck will have one direction going to the west and one direction going to the east.\u201d<\/p>\n<p class=\"STND-STND BodyText\">Exactly when and for how long I-70\u2019s westbound deck will close to traffic remains in question. Officials anticipate selecting a project contractor in mid-November, who will then finalize a work schedule.<\/p>\n<p class=\"STND-STND BodyText\">According to CDOT, phase one of the project would close one lane of traffic on both the east and westbound decks. Phases two and three, however, would include a full westbound deck closure and have tentative completion dates of May 22 and June 19, respectively.<\/p>\n<p class=\"STND-STND BodyText\">\u201cAfter phase three is completed, we are going to be moving to a four-day workweek Monday through Thursday,\u201d said Ipsen. \u201cFriday, Saturday and Sunday there will be no work in the canyon and traffic will change from a two-way, head-to-head detour to a single-lane closure eastbound and a single-lane closure westbound.\u201d<\/p>\n<p class=\"STND-STND BodyText\">The four-day work week will begin around the July 4 holiday and last until early September in an attempt to minimize traffic impacts during the height of the summer tourist season.<\/p>\n<p class=\"STND-STND BodyText\">On average, 17,000 vehicles travel through Glenwood Canyon daily, according to CDOT data, and 6 million utilize the stretch of roadway annually.<\/p>\n<p class=\"STND-STND BodyText\">The forthcoming project intends to resurface the westbound deck with polyester concrete; the same material that was used on the Grand Avenue Bridge.<\/p>\n<p class=\"STND-STND BodyText\">\u201cWe are hoping to get a good 10 to 15 years out of this,\u201d said Ipsen. \u201cEven though it is going to be impactful now, hopefully it will minimize the impacts we are going to have to make in the future.\u201d<\/p>\n<p class=\"STND-STND BodyText\">With construction slated next year, project outreach and stakeholder coordinator Bryana Starbuck said numerous public meetings concerning project updates would occur as the construction nears.<\/p>\n<p class=\"STND-STND BodyText\">\u201cThere is still a lot more information to come,\u201d Starbuck said. \u201cThis is the initial heads-up.\u201d<\/p>\n<p class=\"STND-STND BodyText Tagline\"><a href=\"mailto:mabennett@postindependent.com\">mabennett@postindependent.com<\/a><\/p>\n<p><a href=\"https:\/\/www.aspentimes.com\/news\/i-70-construction-in-glenwood-canyon-set-for-spring\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: The Aspen Times<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Interstate 70 in Glenwood Canyon at No Name, just east of Glenwood Springs.Chelsea Self\/Glenwood Springs Post Independent Starting in spring 2020, the Colorado Department of Transportation (CDOT) will begin extensive roadwork on Interstate 70 westbound between the Hanging Lake and No Name tunnels. The project, likely to start in early April and scheduled to last [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49],"tags":[],"class_list":{"0":"post-2448212","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-local-news"},"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-06-26 00:31:20","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSPN The Valley&#039;s Quality Rock","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kspn","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2448212","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/comments?post=2448212"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2448212\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/media?parent=2448212"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/categories?post=2448212"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/tags?post=2448212"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}