{"id":2449153,"date":"2019-09-25T21:52:00","date_gmt":"2019-09-26T03:52:00","guid":{"rendered":"https:\/\/www.aspentimes.com\/news\/east-snowmass-creek-bridge-completed-parks-officials-say\/"},"modified":"2019-09-25T21:52:00","modified_gmt":"2019-09-26T03:52:00","slug":"east-snowmass-creek-bridge-completed-parks-officials-say","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kspn\/local-news\/east-snowmass-creek-bridge-completed-parks-officials-say\/","title":{"rendered":"East Snowmass Creek Bridge completed, parks officials say"},"content":{"rendered":"<figure class=\"wp-block-image p402_hide\">\n<div class=\"caption-container\">\n<p><img loading=\"lazy\" decoding=\"async\" width=\"465\" height=\"620\" src=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/09\/briefs-svs-092519.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/09\/briefs-svs-092519.jpg 465w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/09\/briefs-svs-092519-225x300.jpg 225w\" sizes=\"auto, (max-width: 465px) 100vw, 465px\"><\/p><figcaption><strong>A provided image of the new bridge over East Snowmass Creek that helps connect the Ditch and East Snowmass trails.<\/strong><br \/><em>Courtesy photo\/Parks, Recreation<\/em><\/figcaption><\/div>\n<\/figure>\n<p class=\"STND-STND BodyText\">The East Snowmass Creek Bridge project was completed on Sept. 20, Snowmass Parks, Recreation and Trails officials said.<\/p>\n<p class=\"STND-STND BodyText\">According to Starr Jamison, town parks and trails manager, parks and White River National Forest Service officials have been working to build the wide, single-log bridge across East Snowmass Creek since Sept. 3.<\/p>\n<p class=\"STND-STND BodyText\">The old bridge fell in 2014 and was never replaced due to funding and staffing constraints. Now five years later, after collaboration with the forest service and funding approval from Town Council, the bridge replacement is a reality.<\/p>\n<p class=\"STND-STND BodyText\">Jamison said Roaring Fork volunteers and over a dozen Basalt High School football players helped put the new bridge in place in recent weeks.<\/p>\n<p class=\"STND-STND BodyText\">Before the new bridge, trial users had to cross through East Snowmass Creek, which Jamison said was sometimes dangerous when water flows were high.<\/p>\n<p class=\"STND-STND BodyText\">\u201cI went out at the end of July and the creek was not passable at that time,\u201d Jamison said. \u201cThe bridge will allow easier and earlier access.\u201d<\/p>\n<p class=\"STND-STND BodyText\">Equestrians will still be required to cross through East Snowmass Creek, Jamison said.<\/p>\n<p><a href=\"https:\/\/www.aspentimes.com\/news\/east-snowmass-creek-bridge-completed-parks-officials-say\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: The Aspen Times<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A provided image of the new bridge over East Snowmass Creek that helps connect the Ditch and East Snowmass trails.Courtesy photo\/Parks, Recreation The East Snowmass Creek Bridge project was completed on Sept. 20, Snowmass Parks, Recreation and Trails officials said. According to Starr Jamison, town parks and trails manager, parks and White River National Forest [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49],"tags":[],"class_list":{"0":"post-2449153","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-local-news"},"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-06-27 08:12:36","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSPN The Valley&#039;s Quality Rock","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kspn","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2449153","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/comments?post=2449153"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2449153\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/media?parent=2449153"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/categories?post=2449153"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/tags?post=2449153"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}