{"id":2450784,"date":"2019-11-06T05:00:00","date_gmt":"2019-11-06T12:00:00","guid":{"rendered":"https:\/\/www.aspentimes.com\/?p=315564"},"modified":"2019-11-06T05:00:00","modified_gmt":"2019-11-06T12:00:00","slug":"town-council-begins-review-of-snowmass-center-redevelopment","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kspn\/local-news\/town-council-begins-review-of-snowmass-center-redevelopment\/","title":{"rendered":"Town Council begins review of Snowmass Center redevelopment"},"content":{"rendered":"<figure class=\"wp-block-image p402_hide\">\n<div class=\"caption-container\"> <img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" src=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/11\/snowmasscenter-svs-110619-1-1024x682.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/11\/snowmasscenter-svs-110619-1-1024x682.jpg 1024w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/11\/snowmasscenter-svs-110619-1-300x200.jpg 300w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/11\/snowmasscenter-svs-110619-1-768x512.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><figcaption><strong>A model of the proposed design for the Snowmass Center redevelopment and expansion brought into Town Council Nov. 4 by Design Workshop, an architectural firm in Aspen.<\/strong><br \/><em>Maddie Vincent\/Snowmass Sun<\/em><\/figcaption><\/div>\n<\/figure>\n<p class=\"STND-STND BodyText DropCap\">Town Council started its quasi-judicial review of the proposed Snowmass Center redevelopment and expansion project Nov. 4.<\/p>\n<p class=\"STND-STND BodyText\">Approved by the Planning Commission with dozens of specified development conditions in early September, the planned redevelopment for the center includes an additional 16,646 square-feet of \u201ccommunity serving\u201d commercial and 78 multi-family residential units (68 free market, 10 deed-restricted); an addition of 138 underground parking spaces, bringing the total above and below surface spots to 324; an atrium and increase in public meeting spaces; a new public transit facility; and significant renovations of the existing center businesses, including the U.S. Post Office and Clark\u2019s Market.<\/p>\n<p class=\"STND-STND BodyText\">But although the project review and public hearing lasted roughly an hour and a half, Town Council held little discussion.<\/p>\n<p class=\"STND-STND BodyText\">Instead, members spent most of the hearing listening to presentations from town staff, members from Aspen\u2019s Design Workshop, who represented the center developers, and a few members of the public.<\/p>\n<p class=\"STND-STND BodyText\">\u201cToday our hope and our desire and our intent is to give Town Council an overview,\u201d said Brian McNellis, town senior planner overseeing the center project. \u201cI think we\u2019ve ended up in a much better place than the sketch plan. This is a much more solid site plan.\u201d<\/p>\n<p class=\"STND-STND BodyText\">To start off, McNellis went over the recent timeline since Town Council approved the center sketch plan in April 2018 and gave council a staff-recommended list of key areas of the proposed project to review, based on the 11 Planning Commission review discussions held between March and September.<\/p>\n<p class=\"STND-STND BodyText\">The list included reviewing the applicant\u2019s requested height, parking and residential unit variances from town policy; the applicant\u2019s suggested community purpose plans in response to exceeding the town\u2019s \u201cfuture buildout\u201d potential identified for the area, which includes a $750,000 monetary contribution for a proposed pedestrian bridge that could extend from the Snowmass Center area to Base Village; what connectivity between the center and Base Village should look like; and what street level services and retail should consist of, along with any other topics of review that arise.<\/p>\n<p class=\"STND-STND BodyText\">Council determined it would make a site visit to the center on Dec. 2, then spend a portion of the majority of its regular meetings through the New Year at least reviewing the 11-building Snowmass Center redevelopment and expansion project.<\/p>\n<p class=\"STND-STND BodyText\">On a recent afternoon a few days before the Nov. 4 council meeting, Richard Shaw and Jessica Garrow with Aspen\u2019s Design Workshop went over the preliminary design plan proposed for the Snowmass Center.<\/p>\n<p class=\"STND-STND BodyText\">By working closely with Eastwood Snowmass Investors, the owners and developers of the center, town Planning Commission members and town officials, Shaw and Garrow said their design team has worked to make the Snowmass Center redevelopment a custom, sure-fit for the town.<\/p>\n<p class=\"STND-STND BodyText\">That means focusing on the goals identified by Town Council through the 2018 comprehensive plan, including creating various public meeting spaces and pedestrian friendly hangouts, like the centrally located, weather protected atrium; increasing connectivity to and from the center; and developing a \u201cmain street\u201d atmosphere, or vibrant town center, for locals and visitors.<\/p>\n<p class=\"STND-STND BodyText\">\u201cThere\u2019s always been a feeling that the center can offer more services and be a place with more of an identity,\u201d Shaw, principal for the Design Workshop, said.<\/p>\n<p class=\"STND-STND BodyText\">\u201cWe\u2019re not trying to replicate Aspen, this is 100% Snowmass and focuses on what the community needs,\u201d Garrow added.<\/p>\n<p class=\"STND-STND BodyText\">Both Shaw and Garrow emphasized these community-minded and collaborative sentiments, anchoring on the \u201c100% Snowmass\u201d motive during the most recent council meeting and going over each element of the proposed plan in detail with the help of a mini Snowmass Center model.<\/p>\n<p class=\"STND-STND BodyText\">\u201cWe wanted to incorporate greater degrees of color and some of the animation and excitement a retail center can bring, but also reflect the history and heritage of Snowmass design,\u201d Shaw said of the center project at the Nov. 4 meeting.<\/p>\n<p class=\"STND-STND BodyText\">But after the presentation, Town Council didn\u2019t just commend the applicant on the improvements to the redevelopment project it has made since the sketch plan stage.<\/p>\n<p class=\"STND-STND BodyText\">Councilman Bob Sirkus called out Shaw\u2019s alleged failure to provide specifics to the Planning Commission when requested during its months-long review of the proposed redevelopment project, instead deferring some commissioner questions to Town Council.<\/p>\n<p class=\"STND-STND BodyText\">\u201cI find that inappropriate. I think it was demeaning to the Planning Commission and frankly in a sense it sabotages the process,\u201d Sirkus said. \u201cI feel that I needed to tell you that.\u201d<\/p>\n<p class=\"STND-STND BodyText\">Tom Fridsteain, a longtime architect and member of the Planning Commission who recused himself from the center review early on, also spoke out after the applicant presentation and brought forth a number of areas he feels Town Council needs to evaluate carefully during its review.<\/p>\n<p class=\"STND-STND BodyText\">Fridstein commended the applicant for its work on the center project, but felt it was important for Town Council and center tenants to know where they will be relocated, for the applicant to include specifics on the design of the proposed atrium area and for councilmembers to really look at the roadway in and out of the center commercial area to ensure delivery service trucks can navigate with enough space and without disrupting pedestrian and vehicular traffic.<\/p>\n<p class=\"STND-STND BodyText\">\u201cThe successful development of the commercial area of the Snowmass Center is critical to the success of our community,\u201d Fridstein said. \u201cThis is a very important element in defining the character and functionality of Snowmass for decades. It must be the best it can be.\u201d<\/p>\n<p class=\"STND-STND BodyText\">On Nov. 5, Garrow said Fridstein raised a lot of important issues and concerns she and the Design Workshop team took a hard look at with the Planning Commission and will continue to discuss with Town Council.<\/p>\n<p class=\"STND-STND BodyText\">Garrow said overall, the team feels good about the forward momentum of Center plan discussions with council, and aims to be as responsive to questions and concerns throughout the review process as possible.<\/p>\n<p class=\"STND-STND BodyText\">Town Council will continue its Snowmass Center discussions after the Dec. 2 site visit scheduled for 3 p.m.<\/p>\n<p class=\"STND-STND BodyText Tagline\"><a href=\"mailto:mvincent@aspentimes.com\">mvincent@aspentimes.com<\/a><\/p>\n<p><a href=\"https:\/\/www.aspentimes.com\/snowmass\/town-council-begins-review-of-snowmass-center-redevelopment\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: The Aspen Times<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A model of the proposed design for the Snowmass Center redevelopment and expansion brought into Town Council Nov. 4 by Design Workshop, an architectural firm in Aspen.Maddie Vincent\/Snowmass Sun Town Council started its quasi-judicial review of the proposed Snowmass Center redevelopment and expansion project Nov. 4. Approved by the Planning Commission with dozens of specified [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49],"tags":[],"class_list":["post-2450784","post","type-post","status-publish","format-standard","category-local-news"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-08-19 08:33:22","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSPN The Valley&#039;s Quality Rock","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kspn","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2450784","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/comments?post=2450784"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2450784\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/media?parent=2450784"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/categories?post=2450784"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/tags?post=2450784"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}