{"id":2452071,"date":"2019-12-10T22:45:00","date_gmt":"2019-12-11T05:45:00","guid":{"rendered":"https:\/\/www.aspentimes.com\/?p=317416"},"modified":"2019-12-10T22:45:00","modified_gmt":"2019-12-11T05:45:00","slug":"city-of-aspen-to-spend-1m-for-schematic-design-for-new-walking-malls","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kspn\/local-news\/city-of-aspen-to-spend-1m-for-schematic-design-for-new-walking-malls\/","title":{"rendered":"City of Aspen to spend $1M for schematic design for new walking malls"},"content":{"rendered":"<figure class=\"wp-block-image p402_hide\">\n<div class=\"caption-container\"> <img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"686\" src=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/12\/Malldesign-atd-12119-1-1024x686.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/12\/Malldesign-atd-12119-1-1024x686.jpg 1024w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/12\/Malldesign-atd-12119-1-300x201.jpg 300w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/12\/Malldesign-atd-12119-1-768x515.jpg 768w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/12\/Malldesign-atd-12119-1-1536x1030.jpg 1536w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/12\/Malldesign-atd-12119-1-2048x1373.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><figcaption><strong>People mill around the walking mall on East Hyman Ave. in Aspen on Tuesday, September 10, 2019. (Kelsey Brunner\/The Aspen Times)<\/strong><br \/><em>KELSEY BRUNNER<\/em><\/figcaption><\/div>\n<\/figure>\n<p class=\"STND-STND BodyText\">Aspen City Council on Tuesday approved a nearly $1 million contract with Design Workshop to produce schematic designs as part of the <a id=\"N0x192f680N0x190c5b0:N0x192f680N0x193b0c0\" href=\"https:\/\/www.aspentimes.com\/magazines\/aspen-times-weekly\/are-aspens-pedestrian-malls-due-for-makeover\/\">repairs<\/a> that will be done on the downtown pedestrian malls.<\/p>\n<p class=\"STND-STND BodyText\">It\u2019s a scaled-back version directed by council in <a id=\"N0x192f680N0x190c610:N0x192f680N0x193b1e0\" href=\"https:\/\/www.aspentimes.com\/news\/local\/aspen-officials-walk-back-pedestrian-mall-plan\/ \">September when it rejected<\/a> a proposed conceptual design that included major changes to the mall, like moving the bathrooms at Wagner Park and other cosmetic alterations.<\/p>\n<p class=\"STND-STND BodyText\">Based on a previous council\u2019s direction, Design Workshop earlier this year proposed a conceptual design for the mall project.<\/p>\n<p class=\"STND-STND BodyText\">But the current council agreed to a $988,000 schematic design contract rather than a previous administration\u2019s $3.8 million plan.<\/p>\n<p class=\"STND-STND BodyText\">What the next phase of work will accomplish is provide guidelines for private developers on how to redevelop buildings so they match up with the city\u2019s specifications on things like grading and bricks, Americans with Disabilities Act compliancy, as well as storm water and utility upgrades.<\/p>\n<p class=\"STND-STND BodyText\">The city is <a id=\"N0x192f680N0x190c670:N0x192f680N0x193b4b0\" href=\"https:\/\/www.aspentimes.com\/news\/downtown-aspen-properties-get-go-ahead-for-new-performing-center\/ \">anticipating that private developers<\/a> will redevelop three quarters of Aspen\u2019s pedestrian malls in the coming years.<\/p>\n<p class=\"STND-STND BodyText\">And with delays in the overall project, officials want guidelines in place prior to development, according to Michelle Bonfils Thibeault, project manager in the city\u2019s capital asset department.<\/p>\n<p class=\"STND-STND BodyText\">Besides trying to time improving the condition of the aging malls with future development, underground utilities and ADA access are driving what will be a very expensive and time consuming project for the city.<\/p>\n<p class=\"STND-STND BodyText\">The mall\u2019s surface is more than 40 years old and some of the underground infrastructure hasn\u2019t been touched in six decades.<\/p>\n<p class=\"STND-STND BodyText\">Additionally, the 320,000 bricks originally laid down in 1976 are deteriorating and need to be replaced, even though there are fewer than 30,000 left and will only last a few more years, according to Thibeault.<\/p>\n<p class=\"STND-STND BodyText Tagline\"><a href=\"mailto:csackariason@aspentimes.com\">csackariason@aspentimes.com<\/a><\/p>\n<p><a href=\"https:\/\/www.aspentimes.com\/news\/local\/city-of-aspen-to-spend-1m-for-schematic-design-for-new-walking-malls\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: The Aspen Times<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>People mill around the walking mall on East Hyman Ave. in Aspen on Tuesday, September 10, 2019. (Kelsey Brunner\/The Aspen Times)KELSEY BRUNNER Aspen City Council on Tuesday approved a nearly $1 million contract with Design Workshop to produce schematic designs as part of the repairs that will be done on the downtown pedestrian malls. It\u2019s [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49],"tags":[],"class_list":{"0":"post-2452071","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-local-news"},"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-06-20 10:37:43","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSPN The Valley&#039;s Quality Rock","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kspn","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2452071","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/comments?post=2452071"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2452071\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/media?parent=2452071"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/categories?post=2452071"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/tags?post=2452071"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}