{"id":2452339,"date":"2019-12-18T00:00:00","date_gmt":"2019-12-18T07:00:00","guid":{"rendered":"https:\/\/www.aspentimes.com\/?p=317808"},"modified":"2019-12-18T00:00:00","modified_gmt":"2019-12-18T07:00:00","slug":"details-unveiled-for-basalt-project-at-former-pan-and-fork-site","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kspn\/local-news\/details-unveiled-for-basalt-project-at-former-pan-and-fork-site\/","title":{"rendered":"Details unveiled for Basalt project at former Pan and Fork site"},"content":{"rendered":"<figure class=\"wp-block-image p402_hide\">\n<div class=\"caption-container\"> <img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"580\" src=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/12\/riverplan-atd-121819-1024x580.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/12\/riverplan-atd-121819-1024x580.jpg 1024w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/12\/riverplan-atd-121819-300x170.jpg 300w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/12\/riverplan-atd-121819-768x435.jpg 768w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/12\/riverplan-atd-121819-1536x869.jpg 1536w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2019\/12\/riverplan-atd-121819-2048x1159.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><figcaption><strong>This drawing shows how a restaurant deck will interact with open space at the Basalt River Park.<\/strong><br \/><em>Courtesy image<\/em><\/figcaption><\/div>\n<\/figure>\n<p class=\"STND-STND BodyText\">A development group headed by Roaring Fork Valley businessman Tim Belinski has submitted its application for final approval on the former Pan and Fork site near downtown Basalt.<\/p>\n<p class=\"STND-STND BodyText\">The Basalt Town Council granted the first of two necessary approvals in May. Now the project is advancing from sketch plan to final approval, where the devil is in the details.<\/p>\n<p class=\"STND-STND BodyText\">Belinski, managing member of Basalt River Park LLC, didn\u2019t unveil any surprises or drastic differences in his final application.<\/p>\n<p class=\"STND-STND BodyText\">The development group is proposing to use 52,707 square feet of land for development and nearly 43,000 square feet for park. The site is located along Two Rivers Road, tucked between Midland Avenue and Rocky Mountain Institute\u2019s Innovation Center. The parkland is proposed to be sold to the town of Basalt to expand the existing river park. The town government is working on a <a id=\"N0x1eb6c00N0x1ec72e0:N0x1eb6c00N0x1e7ff50\" href=\"https:\/\/www.aspentimes.com\/news\/local\/basalt-river-park-finally-takes-shape-with-1-million-plan\/\">$1 million plan<\/a> for facilities at the park.<\/p>\n<p class=\"STND-STND BodyText\">\u201c(The project) boasts an innovative design that will enliven this corner of Basalt, and accompany the adjacent Rocky Mountain Institute and Roaring Fork Conservancy buildings,\u201d the application said. \u201cActing in part as a home base for artistic activity in town, the campus is designed to invite public engagement, bringing the energies of commercial, residential, parkland and artistic creation together in one campus-like site.\u201d<\/p>\n<p class=\"STND-STND BodyText\">The components of the plan are:<\/p>\n<p class=\"STND-STND BodyText ListBullet\">24 residences, including 11 free-market townhouses, nine free-market homes and four affordable housing units.<\/p>\n<p class=\"STND-STND BodyText ListBullet\">A 3,000-square-foot restaurant with an outdoor patio that will be located in prime position to overlook and interact with the park.<\/p>\n<p class=\"STND-STND BodyText ListBullet\">11,500 square feet of commercial space with 12% dedicated to nonprofit offices.<\/p>\n<p class=\"STND-STND BodyText ListBullet\">Slightly more than 6,000 square feet for the Art Base, a community arts center, including space for galleries, educational classrooms, studios, alternating exhibits and special events. It will boast a rooftop patio that the application predicted will evolve to be the prime place for events.<\/p>\n<p class=\"STND-STND BodyText ListBullet\">Off-street parking for the residences and 40 on-street spaces.<\/p>\n<p class=\"STND-STND BodyText ListBullet\">Total floor area development of slightly more than 55,000 square feet.<\/p>\n<p class=\"STND-STND BodyText\">The application claimed the project would bring the vitality wanted for downtown with the development while still allowing a signature park to expand.<\/p>\n<p class=\"STND-STND BodyText\">\u201cThe campus layout is integrated with the development of the new public park on the eastern side of the campus, and intended to bring the entire downtown Basalt community closer to the river,\u201d the application said.<\/p>\n<p class=\"STND-STND BodyText\">Belinski told the council in May the project would be constructed in phases and probably take <a id=\"N0x1eb6c00N0x1ec7640:N0x1eb6c00N0x1e80610\" href=\"https:\/\/www.aspentimes.com\/news\/developer-pan-and-fork-project-in-basalt-could-take-three-years-to-build\/\">three years to complete<\/a>.<\/p>\n<p class=\"STND-STND BodyText\">The Basalt Planning and Zoning Commission will begin its review in \u201cearly January,\u201d according to the planning department, and then the project will advance to the council.<\/p>\n<p class=\"STND-STND BodyText Tagline\"><a href=\"mailto:scondon@aspentimes.com\">scondon@aspentimes.com<\/a><\/p>\n<p><a href=\"https:\/\/www.aspentimes.com\/news\/local\/details-unveiled-for-basalt-project-at-former-pan-and-fork-site\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: The Aspen Times<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>This drawing shows how a restaurant deck will interact with open space at the Basalt River Park.Courtesy image A development group headed by Roaring Fork Valley businessman Tim Belinski has submitted its application for final approval on the former Pan and Fork site near downtown Basalt. The Basalt Town Council granted the first of two [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49],"tags":[],"class_list":["post-2452339","post","type-post","status-publish","format-standard","category-local-news"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-08-19 01:43:30","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSPN The Valley&#039;s Quality Rock","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kspn","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2452339","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/comments?post=2452339"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2452339\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/media?parent=2452339"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/categories?post=2452339"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/tags?post=2452339"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}