{"id":2453467,"date":"2020-01-21T00:00:00","date_gmt":"2020-01-21T07:00:00","guid":{"rendered":"https:\/\/www.aspentimes.com\/?p=319357"},"modified":"2020-01-21T10:15:28","modified_gmt":"2020-01-21T17:15:28","slug":"crown-mountain-park-goes-to-plan-b-for-indoor-facilities-in-midvalley","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kspn\/local-news\/crown-mountain-park-goes-to-plan-b-for-indoor-facilities-in-midvalley\/","title":{"rendered":"Crown Mountain Park goes to Plan B for indoor facilities in midvalley"},"content":{"rendered":"<figure class=\"wp-block-image p402_hide\">\n<div class=\"caption-container\"> <img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" src=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/01\/fieldhouse-atd-0120201-1024x682.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/01\/fieldhouse-atd-0120201-1024x682.jpg 1024w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/01\/fieldhouse-atd-0120201-300x200.jpg 300w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/01\/fieldhouse-atd-0120201-768x512.jpg 768w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/01\/fieldhouse-atd-0120201-1536x1024.jpg 1536w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/01\/fieldhouse-atd-0120201-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><figcaption><strong>A vehicle from Basalt Public Works pulls up to a storage shed adjacent to Crown Mountain Park in October. The park and recreation district will explore if two buildings can be salvaged for storage, meeting space and recreation.<\/strong><br \/><em>Kelsey Brunner\/The Aspen Times<\/em><\/figcaption><\/div>\n<\/figure>\n<p class=\"STND-STND BodyText DropCap\">After determining that building a new fieldhouse in El Jebel would be cost-prohibitive at around $20 million, Crown Mountain Park and Recreation District will explore if largely abandoned buildings at the edge of the park can be salvaged for use.<\/p>\n<p class=\"STND-STND BodyText\">The recreation district\u2019s board of directors gave the staff a nod last week to have a consultant assess how two buildings could be used and prepare architectural renderings. Once that work is completed, the district will also determine what level of asbestos mitigation must occur, according to Becky Wagner, the district\u2019s executive director.<\/p>\n<p class=\"STND-STND BodyText\">The list of potential uses includes equipment storage, offices and meeting space for youth and seniors.<\/p>\n<p class=\"STND-STND BodyText\">\u201cWhat I would like to see as a board member is for our kids to have a place to go after school instead of them just going home and playing video games in their basement,\u201d Robert Hubbell, a board member, said at Thursday night\u2019s meeting. \u201cTragic things have happened to good friends of mine and I want us as a community to have a place for our kids to go after school.<\/p>\n<p class=\"STND-STND BodyText\">\u201cI would love to have a place for our seniors to go during the day,\u201d Hubbell continued. \u201cWe need other facilities. I\u2019m not talking a fieldhouse. I\u2019m not talking a rec center. I\u2019m just talking a small, simple facility.\u201d<\/p>\n<p class=\"STND-STND BodyText\">Tim Power Smith, board chairman, said he would want indoor turf for events such as soccer and indoor batting cages included among the uses.<\/p>\n<p class=\"STND-STND BodyText\">Looking into use of the buildings on the west end of the park is Plan B. Plan A was looking into a new structure in El Jebel. The district initially hired Barker Rinker Seacat Architecture to estimate the cost of an indoor facility in El Jebel on land potentially available for lease from the Crawford family. Representatives of the recreation district met with the consultant team Oct. 15 to discuss trends in the recreation industry and estimate space requirements.<\/p>\n<p class=\"STND-STND BodyText\">The architecture firm estimated the cost range between $18.9 million to $25.6 million, based on the programming desired.<\/p>\n<p class=\"STND-STND BodyText\">\u201cI was extremely disappointed with the analysis that came back,\u201d Hubbell said.<\/p>\n<p class=\"STND-STND BodyText\">Wagner said the cost estimates were so high that the representatives of the district decided against presenting the results to the whole board.<\/p>\n<p class=\"STND-STND BodyText\">\u201cWe saw the numbers and we were surprised by the numbers,\u201d she said. \u201cAt that moment, between us, we said we\u2019re going to hold back and let\u2019s get some more information before presenting it to the board.\u201d<\/p>\n<p class=\"STND-STND BodyText\">She informed the board about the hefty estimates via email Oct. 24. Meanwhile, the possibility of using the abandoned buildings adjacent to the park became a more viable option.<\/p>\n<p class=\"STND-STND BodyText\">\u201cI stated, \u2018Right now, we\u2019ll be holding off until we know which direction we want to go with the architectural renderings,\u2019\u201d Wagner said. \u201cThat\u2019s what the frustration is \u2014 we haven\u2019t talked about it since October.\u201d<\/p>\n<p class=\"STND-STND BodyText\">Barker Rinker Seacat was placed on hold after about $3,700 of an $11,000 contract with the firm was spent exploring the El Jebel fieldhouse, Wagner said. Now the firm will be directed to revive work looking at the existing buildings at the park.<\/p>\n<p class=\"STND-STND BodyText\">\u201cThis would be within the existing budget,\u201d Wagner said. \u201cIt wouldn\u2019t be adding anything to it. It\u2019s really just switching the location.\u201d<\/p>\n<p class=\"STND-STND BodyText\">The buildings are leftovers from when the U.S. Forest Service operated the Mount Sopris Tree Nursery on the site from the 1960s to 1987. After the operation ceased, the Forest Service was negotiating a land swap with a private developer when Pitkin and Eagle counties intervened. After years of negotiations and failed attempts to get legislation approved, a land swap between the feds and the counties finally occurred in 1994. Pitkin County traded 1,258 acres of mining claims and Eagle County added 49 acres.<\/p>\n<p class=\"STND-STND BodyText\">A large former warehouse has sat vacant since the exchange. A smaller shed has been used for equipment storage. Wagner said the storage building is in \u201crough shape\u201d while the larger building is in \u201creally good shape\u201d but at risk of deteriorating due to neglect. It needs a roof as soon as possible, she said.<\/p>\n<p class=\"STND-STND BodyText\">Recent tests also have shown the 1960s buildings have asbestos in drywall, mortar and pipe insulation.<\/p>\n<p class=\"STND-STND BodyText\">Barker Rinker Seacat will be asked to determine if the building can be salvaged and the larger one put to use as a gathering spot and place for indoor sporting activities. If rehabilitation were feasible, Crown Mountain Park and Recreation District would have to lease the structures from Eagle County.<\/p>\n<p class=\"STND-STND BodyText\">County Manager Jeff Shroll said renting the larger building seems doable but \u201cwe have not had any discussion on lease rate or what terms we would need to consider.\u201d There have only been preliminary discussions so far.<\/p>\n<p class=\"STND-STND BodyText\">\u201cOne of the buildings that is currently being used is in really rough shape and likely could not be rehabbed into anything and may just need to come down,\u201d Shroll wrote in an email to The Aspen Times. \u201cThe other building likely could be saved in some fashion and repurposed.\u201d<\/p>\n<p class=\"STND-STND BodyText\">It hasn\u2019t been determined who would be responsible for the cost of asbestos mitigation and replacing the roof, he said. The building will also need \u201csignificant plumbing, electric, HVAC and other improvements\u201d before it can be used, Shroll noted.<\/p>\n<p class=\"STND-STND BodyText\">\u201cEven with those issues, that may still be appealing to Crown Mountain as it is likely a cheaper way to get some indoor recreation activated than brand new construction,\u201d Shroll wrote.<\/p>\n<p class=\"STND-STND BodyText\">That\u2019s what Crown Mountain officials believe, as well. Board member Bonnie Scott said it is a \u201cno-brainer\u201d to take advantage of the existing buildings for storage and other uses. Power Smith agreed.<\/p>\n<p class=\"STND-STND BodyText\">\u201cIf it\u2019s more cost effective to fix the assets that are already there, then absolutely I\u2019m in agreement with that,\u201d he said.<\/p>\n<p class=\"STND-STND BodyText\">In other action taken by the Crown Mountain board of directors, a <a id=\"N0x1e318c0N0x1e52580:N0x1e318c0N0x1e6ac58\" href=\"https:\/\/www.aspentimes.com\/news\/local\/crown-mountain-park-board-in-el-jebel-wrestles-with-public-relations-issues\/\">contract for public relations<\/a> services from b2 Inc. was unanimously approved.<\/p>\n<p class=\"STND-STND BodyText Tagline\"><a href=\"mailto:scondon@aspentimes.com\">scondon@aspentimes.com<\/a><\/p>\n<p><a href=\"https:\/\/www.aspentimes.com\/news\/local\/crown-mountain-park-goes-to-plan-b-for-indoor-facilities-in-midvalley\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: The Aspen Times<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A vehicle from Basalt Public Works pulls up to a storage shed adjacent to Crown Mountain Park in October. The park and recreation district will explore if two buildings can be salvaged for storage, meeting space and recreation.Kelsey Brunner\/The Aspen Times After determining that building a new fieldhouse in El Jebel would be cost-prohibitive at [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49],"tags":[],"class_list":["post-2453467","post","type-post","status-publish","format-standard","category-local-news"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-08-18 19:59:53","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSPN The Valley&#039;s Quality Rock","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kspn","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2453467","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/comments?post=2453467"}],"version-history":[{"count":1,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2453467\/revisions"}],"predecessor-version":[{"id":2453491,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2453467\/revisions\/2453491"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/media?parent=2453467"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/categories?post=2453467"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/tags?post=2453467"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}