{"id":2453873,"date":"2020-01-29T05:00:00","date_gmt":"2020-01-29T12:00:00","guid":{"rendered":"https:\/\/www.aspentimes.com\/?p=320030"},"modified":"2020-01-29T05:00:00","modified_gmt":"2020-01-29T12:00:00","slug":"town-council-continues-to-focus-on-height-density-of-snowmass-center-redevelopment","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kspn\/local-news\/town-council-continues-to-focus-on-height-density-of-snowmass-center-redevelopment\/","title":{"rendered":"Town Council continues to focus on height, density of Snowmass Center redevelopment"},"content":{"rendered":"<figure class=\"wp-block-image p402_hide\">\n<div class=\"caption-container\"> <img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"662\" src=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/01\/center-svs-012920-2-1024x662.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/01\/center-svs-012920-2-1024x662.jpg 1024w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/01\/center-svs-012920-2-300x194.jpg 300w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/01\/center-svs-012920-2-768x497.jpg 768w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/01\/center-svs-012920-2-1536x994.jpg 1536w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/01\/center-svs-012920-2-2048x1325.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><figcaption><strong>An graphic provided to Town Council that shows the heights of the proposed Snowmass Center buildings.<\/strong><br \/><em>Courtesy photo\/Town of Snowmass<\/em><\/figcaption><\/div>\n<\/figure>\n<p class=\"STND-STND BodyText\">In early November, Town Council began its quasi-judicial review of the proposed redevelopment plan for the Snowmass Center.<\/p>\n<p class=\"STND-STND BodyText\">Brought forth by Design Workshop and Eastwood Snowmass Investors, the group that owns the current center, the redevelopment includes an additional 16,646 square-feet of \u201ccommunity serving\u201d commercial space, 78 multi-family residential units (68 free market, 10 deed-restricted), and other significant renovations to parking, public transit and existing center businesses in the 11-building proposal.<\/p>\n<p class=\"STND-STND BodyText\">Over the past two months and a handful of public hearings, Town Council has focused its review of the proposal on a few key areas: height, density and viewplanes. And according to Brian McNellis, the town senior planner overseeing the center project, this prolonged focus is about just what he expected.<\/p>\n<p class=\"STND-STND BodyText\">\u201cLarge developments never go without controversy,\u201d he said. \u201cIt takes a long time to tackle each issue and topic so we just try to chip away one piece at a time.\u201d<\/p>\n<p class=\"STND-STND BodyText\">McNellis also said it\u2019s important for the public to understand that Planned Unit Development, or PUD project applications, which the center redevelopment is proposed as, are inherently complicated.<\/p>\n<p class=\"STND-STND BodyText\">In a nutshell, the PUD process aims to allow for variations from the strict application of certain standards of the town\u2019s zoning districts so project applicants can exercise creativity and increase community value, according to town documents.<\/p>\n<p class=\"STND-STND BodyText\">With PUD processes come lengthy reviews by town staff, the planning commission and Town Council, as McNellis touched on, to determine whether the requested variances should be approved and if other community value-related conditions must be put in place.<\/p>\n<p class=\"STND-STND BodyText\">At the recent Town Council review discussion Jan. 21, council members rehashed previously expressed concerns, including the redeveloped center buildings exceeding the town\u2019s 38-foot height limit and 100% build out for the center area; the limited downvalley views and wall effect the proposed buildings could create for Woodbridge Condominiums tenants; and the need for a clarified parking plan.<\/p>\n<p class=\"STND-STND BodyText\">On Jan. 6, council members asked the applicant to look at reconfiguring the project so that it fit within the 38-foot height limit and to bring back renderings of what a Woodbridge Condominiums tenant would see from their home when looking toward the center.<\/p>\n<p class=\"STND-STND BodyText\">In a roughly 30-minute presentation Jan. 21, which Town Council asked be shortened moving forward, Design Workshop\u2019s Richard Shaw and Jessica Garrow showed the Woodbridge Condominiums viewplanes and expressed that the redevelopment project would not be viable if they were to work within the 38-foot height limit set for the center area.<\/p>\n<p class=\"STND-STND BodyText\">\u201cThere is greater than 38 feet in each of the buildings as the result or topography and the result I have to suggest to you is that 38 feet leaves the center as it is today,\u201d Shaw explained Jan. 21.<\/p>\n<p class=\"STND-STND BodyText\">\u201cThere isn\u2019t a redevelopment plan that we find viable that would make it possible to create a project with a strict application and no variance to height greater than 38 feet.\u201d<\/p>\n<p class=\"STND-STND BodyText\">But Town Council still voiced that the requested height- and density-related variances may be too much.<\/p>\n<p class=\"STND-STND BodyText\">\u201cI\u2019m not where you are in justification for 100% (build out),\u201d Mayor Markey Butler said to the applicant on Jan. 21. \u201cThere\u2019s not a lot of support here for the density, that needs to reduced and reduced considerably.\u201d<\/p>\n<p class=\"STND-STND BodyText\">More directly, Butler and the two other council members present Jan. 21 said they were more comfortable with higher height variances in the proposed buildings backing up to the ridgeline behind the current center, but uncomfortable with the density and heights of the buildings off of Lower Kearns Road and adjacent to the existing condominiums.<\/p>\n<p class=\"STND-STND BodyText\">\u201cThose buildings have the greatest blockage of views looking downvalley,\u201d Councilman Bill Madsen said. \u201cIt\u2019s important to have that real open feeling and it just feels pretty tight in there.\u201d<\/p>\n<p class=\"STND-STND BodyText\">A week after the Jan. 21 hearing, Shaw and Garrow said they don\u2019t have a reponse to Town Council\u2019s concerns and questions about the height and density of the redevelopment project yet, but emphasized that they\u2019ve worked hard to listen and act on the town\u2019s feedback.<\/p>\n<p class=\"STND-STND BodyText\">The Design Workshop officials also said they feel it is important for the redevelopment project to be looked at in its entirety as a mixed-use, 100% Snowmass neighborhood versus separate buildings, and for locals to understand that PUD projects with similar variance requests are not uncommon in the village.<\/p>\n<p class=\"STND-STND BodyText\">\u201cRedevelopment is essential to take what is a 40-year-old building and make it much more functional,\u201d Shaw said. \u201cThere is a place here for some disagreement between Town Council and the applicant and we hope to continue talking about these various topics within the bigger idea here.\u201d<\/p>\n<p class=\"STND-STND BodyText\">While Shaw, Garrow and McNellis acknowledged there may be a long road of discussion ahead once Town Council decides on what height and density it may be comfortable with for the Snowmass Center redevelopment, McNellis emphasized that the public hearings are the best place for locals to share their opinions with council and weigh in on what they hope to see with the project.<\/p>\n<p class=\"STND-STND BodyText\">\u201cFor projects like this that have a significant impact on the town, these hearings are a really good opportunity for people to come forward and voice their support or nonsupport for the project,\u201d McNellis said.<\/p>\n<p class=\"STND-STND BodyText\">The next Snowmass Center redevelopment review and public hearing is scheduled for Feb. 18 at 4 p.m.<\/p>\n<p class=\"STND-STND BodyText\"><a href=\"mailto:mvincent@aspentimes.com\">mvincent@aspentimes.com<\/a><\/p>\n<p><a href=\"https:\/\/www.aspentimes.com\/snowmass\/town-council-continues-to-focus-on-height-density-of-snowmass-center-redevelopment\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: The Aspen Times<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>An graphic provided to Town Council that shows the heights of the proposed Snowmass Center buildings.Courtesy photo\/Town of Snowmass In early November, Town Council began its quasi-judicial review of the proposed redevelopment plan for the Snowmass Center. Brought forth by Design Workshop and Eastwood Snowmass Investors, the group that owns the current center, the redevelopment [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49],"tags":[],"class_list":["post-2453873","post","type-post","status-publish","format-standard","category-local-news"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-08-18 18:30:33","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSPN The Valley&#039;s Quality Rock","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kspn","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2453873","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/comments?post=2453873"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2453873\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/media?parent=2453873"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/categories?post=2453873"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/tags?post=2453873"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}