{"id":2454045,"date":"2020-02-03T01:44:00","date_gmt":"2020-02-03T08:44:00","guid":{"rendered":"https:\/\/www.aspentimes.com\/news\/aspens-electeds-deny-developer-extension-on-his-right-to-redevelop-main-street-hotel\/"},"modified":"2020-02-03T01:44:00","modified_gmt":"2020-02-03T08:44:00","slug":"aspens-electeds-deny-developer-extension-on-his-right-to-redevelop-main-street-hotel","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kspn\/local-news\/aspens-electeds-deny-developer-extension-on-his-right-to-redevelop-main-street-hotel\/","title":{"rendered":"Aspen\u2019s electeds deny developer extension on his right to redevelop Main Street hotel"},"content":{"rendered":"<figure class=\"wp-block-image p402_hide\">\n<div class=\"caption-container\"> <img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/02\/Mollygibson-atd-020320-1-1024x768.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/02\/Mollygibson-atd-020320-1-1024x768.jpg 1024w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/02\/Mollygibson-atd-020320-1-300x225.jpg 300w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/02\/Mollygibson-atd-020320-1-768x576.jpg 768w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/02\/Mollygibson-atd-020320-1-1536x1152.jpg 1536w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/02\/Mollygibson-atd-020320-1-2048x1536.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><\/div>\n<\/figure>\n<p class=\"STND-STND BodyText\">A developer is preparing to raze and replace two lodges on Main Street that will be under construction simultanously for almost two years.<\/p>\n<p class=\"STND-STND BodyText\"><a id=\"N0x144fc70N0x152b070:N0x144fc70N0x1533088\" href=\"https:\/\/d3n9y02raazwpg.cloudfront.net\/cityofaspen\/d053f59a-0fbc-11ea-8baa-0050569183fa-da76106a-2e02-4fe6-bbb2-ae71e53e957b-1579881216.pdf\">Aspen City Council last week denied<\/a> developer Michael Brown\u2019s request for an extension on his vesting rights to redevelop the Molly Gibson Lodge.<\/p>\n<p class=\"STND-STND BodyText\">Brown, who also owns the Hotel Aspen across the street from the Molly Gibson, was attempting to avoid having both lodges offline and letting go of employees, who are shared between the properties.<\/p>\n<p class=\"STND-STND BodyText\">With construction slated to begin in the fall for the Hotel Aspen and vesting rights expiring in June on the Molly Gibson, Brown was asking for two more years.<\/p>\n<p class=\"STND-STND BodyText\">He already is living on a two-year extension that was granted in 2018; the project was <a id=\"N0x144fc70N0x152b0d0:N0x144fc70N0x15332c8\" href=\"https:\/\/www.aspentimes.com\/news\/molly-gibson-lodge-wins-council-approval\/ \">approved in 2015<\/a>.<\/p>\n<p class=\"STND-STND BodyText\">Councilwoman Rachel Richards said there wasn\u2019t a compelling reason for the community to grant another extension.<\/p>\n<p class=\"STND-STND BodyText\">\u201cWhere is the enhanced community benefit?\u201d she asked, adding that she wonders why Brown and his co-owner brother, Aaron, didn\u2019t redevelop the Molly Gibson in the past five years when the market was ripe with low-interest rates and high demand for lodging.<\/p>\n<p class=\"STND-STND BodyText\">She also noted that it might be better to just get the construction done in one fell swoop rather than phase it.<\/p>\n<p class=\"STND-STND BodyText\">\u201cI\u2019m a little nervous about how many things have been approved and are going up in the coming years,\u201d Richards said.<\/p>\n<p class=\"STND-STND BodyText\">Brown told council he\u2019s prepared to submit for building permits for the Molly Gibson and has put more than $1 million into planning for the project.<\/p>\n<p class=\"STND-STND BodyText\">\u201cIf you guys don\u2019t see the benefit to it, I\u2019m not going to make the case; we\u2019ll deal the hand were dealt,\u201d he said.<\/p>\n<p class=\"STND-STND BodyText\">Stan Clauson, the land-use planner hired for both projects, said the complexities surrounding the Hotel Aspen delayed construction.<\/p>\n<p class=\"STND-STND BodyText\">Having both properties under construction at the same time will impact the community both in terms of activity on Main Street and the tourism economy.<\/p>\n<p class=\"STND-STND BodyText\">\u201cIt will be a significant hit to the city\u2019s lodging base,\u201d he told the council.<\/p>\n<p class=\"STND-STND BodyText\">That argument didn\u2019t sway elected officials.<\/p>\n<p class=\"STND-STND BodyText\">Councilwoman Ann Mullins and Mayor Torre said they generally don\u2019t support extending vested rights for developers.<\/p>\n<p class=\"STND-STND BodyText\">Mike Kraemer, a senior planner in the city\u2019s Community Development Department, said disruption to traffic may occur, but the city requires construction management plans for projects, including access, to help minimize impacts.<\/p>\n<p class=\"STND-STND BodyText\">He also noted that the Molly Gibson and Hotel Aspen have dedicated alley access, which can be used for construction staging and would alleviate disruptions to Main Street.<\/p>\n<p class=\"STND-STND BodyText\">Council also denied Brown\u2019s request to remove the one-bedroom affordable housing apartment in the Molly Gibson and replace it off site with a second bedroom.<\/p>\n<p class=\"STND-STND BodyText\">Removing the housing unit and putting two approved basement lodge units above grade would allow for more conference space, Brown said.<\/p>\n<p class=\"STND-STND BodyText\">\u201cIt creates a better hotel, which is better for the community,\u201d he told council, explaining that the conference room could be a gathering place for locals.<\/p>\n<p class=\"STND-STND BodyText\">The Molly Gibson is approved as a 20,575-square-foot lodge with 68 rooms averaging around 300 square feet each, along with two single-family residences that are 4,500 square feet each.<\/p>\n<p class=\"STND-STND BodyText\">The lodge currently has 53 rooms, and <a id=\"N0x144fc70N0x152b130:N0x144fc70N0x1533d78\" href=\"https:\/\/www.aspentimes.com\/news\/whittled-down-council-will-decide-on-hotel-aspen\/ \">Hotel Aspen<\/a> will go from 45 to 54 rooms.<\/p>\n<p class=\"STND-STND BodyText\">The Browns received approval before the city enacted a new land-use code and a 28-foot height limit on buildings in town.<\/p>\n<p class=\"STND-STND BodyText\">Both the Molly Gibson and Hotel Aspen are approved to be 32 feet tall.<\/p>\n<p class=\"STND-STND BodyText\">The 2015 lodge approval also permitted the Molly Gibson redevelopment to maintain an existing offstreet parking deficit for the project.<\/p>\n<p class=\"STND-STND BodyText\">Currently, 12 parking spaces are approved for the lodge. Today\u2019s land-use code would require 34 parking spaces.<\/p>\n<p class=\"STND-STND BodyText Tagline\"><a href=\"mailto:csackariason@aspentimes.com\">csackariason@aspentimes.com<\/a><\/p>\n<p><a href=\"https:\/\/www.aspentimes.com\/news\/local\/aspens-electeds-deny-developer-extension-on-his-right-to-redevelop-main-street-hotel\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: The Aspen Times<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A developer is preparing to raze and replace two lodges on Main Street that will be under construction simultanously for almost two years. Aspen City Council last week denied developer Michael Brown\u2019s request for an extension on his vesting rights to redevelop the Molly Gibson Lodge. Brown, who also owns the Hotel Aspen across the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49],"tags":[],"class_list":["post-2454045","post","type-post","status-publish","format-standard","category-local-news"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-08-18 17:45:44","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSPN The Valley&#039;s Quality Rock","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kspn","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2454045","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/comments?post=2454045"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2454045\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/media?parent=2454045"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/categories?post=2454045"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/tags?post=2454045"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}