{"id":2454126,"date":"2020-02-04T23:00:00","date_gmt":"2020-02-05T06:00:00","guid":{"rendered":"https:\/\/www.aspentimes.com\/?p=320307"},"modified":"2020-02-05T07:38:47","modified_gmt":"2020-02-05T14:38:47","slug":"performing-arts-center-ready-to-become-reality-in-willits","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kspn\/local-news\/performing-arts-center-ready-to-become-reality-in-willits\/","title":{"rendered":"Performing arts center ready to become reality in Willits"},"content":{"rendered":"<figure class=\"wp-block-image p402_hide\">\n<div class=\"caption-container\"> <img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"736\" src=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/02\/willitsrush-atd-020520-1024x736.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/02\/willitsrush-atd-020520-1024x736.jpg 1024w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/02\/willitsrush-atd-020520-300x216.jpg 300w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/02\/willitsrush-atd-020520-768x552.jpg 768w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/02\/willitsrush-atd-020520-1536x1103.jpg 1536w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/02\/willitsrush-atd-020520-2048x1471.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><figcaption><strong>A sign is erected along the Willits Lane at the future site of what it billed, &#8220;A 21st century performing arts center.&#8221; Construction will commence this spring.<\/strong><br \/><em>Scott Condon\/The Aspen Times<\/em><\/figcaption><\/div>\n<\/figure>\n<p class=\"STND-STND BodyText DropCap\">The group behind a performing arts center in Willits has raised enough funds to pursue construction.<\/p>\n<p class=\"STND-STND BodyText\">The Arts Campus at Willits has crossed the $3 million threshold, which is more than half of the estimated cost. TACAW, as the organization is known, has land-use approvals from the town of Basalt to build a 10,000-square-foot center called The Contemporary.<\/p>\n<p class=\"STND-STND BodyText\">Ryan Honey, TACAW\u2019s executive director, said the nonprofit organization will apply in March for a building permit with the goal of breaking ground this spring. The Contemporary will take about 12 months to complete, so opening will be in spring 2021.<\/p>\n<p class=\"STND-STND BodyText\">\u201cEveryone\u2019s thrilled to finally be at the stage where we\u2019re ready to be building the building,\u201d Honey said.<\/p>\n<p class=\"STND-STND BodyText\">Fundraising continues for the balance of the project\u2019s cost.<\/p>\n<p class=\"STND-STND BodyText\">\u201cWe have also come to terms with Alpine Bank for a construction loan backed by municipal bonds issued through the Colorado Education and Arts Facility Authority,\u201d Honey wrote to the Basalt Town Council in a quarterly report in January. That bond backing will be formalized at a meeting in March, he said.<\/p>\n<p class=\"STND-STND BodyText\">The Contemporary is being billed as a <a id=\"N0x2c0b4c0N0x2c0f750:N0x2c0b4c0N0x2c94268\" href=\"https:\/\/www.aspentimes.com\/news\/local\/basalt-officials-say-proposed-performing-arts-center-will-make-its-stamp-at-willits\/\">signature civic structure<\/a> in Basalt. It will host everything from theater to music and will include a commercial-grade kitchen for cooking demonstrations and on-site catering. The center will feature a flexible performance space that will accommodate about 240 seated patrons or 395 standing.<\/p>\n<p class=\"STND-STND BodyText\">The Contemporary will build off the success of The Temporary, a venue that TACAW operated in rented space at Willits until it lost the lease in 2019. TACAW was able to rent the vacant site of The Contemporary from the town of Basalt for 99 years. The site is along Willits Lane and will be adjacent to a new workforce housing project that Aspen Skiing Co. will construct.<\/p>\n<p class=\"STND-STND BodyText\">Skico received <a id=\"N0x2c0b4c0N0x2c0f7b0:N0x2c0b4c0N0x2c94418\" href=\"https:\/\/www.aspentimes.com\/news\/basalt-council-approves-skico-housing-frees-funds-for-arts-center-at-willits\/\">land-use approvals<\/a> for the 53,000-square-foot project in July. Its recent application for a building permit is under review by the Basalt planning department. Skico\u2019s goal is to break ground this spring, weather permitting. It will take about one year to construct.<\/p>\n<p class=\"STND-STND BodyText\">The building will have 43 units, with 18% voluntarily deed restricted for Basalt and midvalley child care professionals. There will be a total of 150 bedrooms.<\/p>\n<p class=\"STND-STND BodyText\">The building will be one of the first of its size in Colorado to rely completely on electric power, according to Skico\u2019s January Greenletter, a monthly newsletter on environmental issues for Skico employees. Once Holy Cross Energy achieves getting its power grid on 100% renewable sources, the apartment complex will be net-zero, Auden Schendler, Skico\u2019s senior vice president of sustainability and community engagement, wrote in the newsletter.<\/p>\n<p class=\"STND-STND BodyText\">\u201cAs you know, electrification is a key climate solution, because we heat most buildings by combusting fossil fuels,\u201d the Greenletter said. \u201cBut electrification is only one cool feature of the building, which will be highly energy efficient \u2014 meaning well-insulated, sealed, with good windows, and not too many of them.\u201d<\/p>\n<p class=\"STND-STND BodyText\">A preliminary cost projection indicates the most efficient electric, mechanical and plumbing package will reduce the building\u2019s annual electricity bill from $61,000 to $38,000 per year.<\/p>\n<p class=\"STND-STND BodyText\">A third construction project is on track to crank up in Willits this spring. The planning department is reviewing the building-permit application for a structure with about 7,000 square feet of commercial space in the ground floor and 32 apartments on the upper floors.<\/p>\n<p class=\"STND-STND BodyText\">The project is the second phase of work on a site being developed by Roaring Fork Valley businessmen Tim Belinski and Andrew Light. They are completing a seven-unit, luxury-housing complex called One Willits Place. Now they will break ground to the north of that luxury housing.<\/p>\n<p class=\"STND-STND BodyText\">The second phase of the project will be called East Valley, according to Belinski. The commercial space will be condominiumized and sold, he said. The 32 apartments will be one- and two-bedroom, free-market units that will be rented. The site is across East Valley Road from Mezzaluna restaurant.<\/p>\n<p class=\"STND-STND BodyText\">\u201cThe project will break ground this spring and the apartments will be ready for move-in this time next year,\u201d Belinski said in an email. \u201cThe commercial will be up and running in the spring of 2021.\u201d<\/p>\n<p class=\"STND-STND BodyText\"> The Vail-based Steadman Clinic has not yet applied for a building permit to construct a planned facility on land it purchased in Willits along Willits Lane.<\/p>\n<p class=\"STND-STND BodyText Tagline\"><a href=\"mailto:scondon@aspentimes.com\">scondon@aspentimes.com<\/a><\/p>\n<p><a href=\"https:\/\/www.aspentimes.com\/news\/local\/performing-arts-center-ready-to-become-reality-in-willits\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: The Aspen Times<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A sign is erected along the Willits Lane at the future site of what it billed, &#8220;A 21st century performing arts center.&#8221; Construction will commence this spring.Scott Condon\/The Aspen Times The group behind a performing arts center in Willits has raised enough funds to pursue construction. The Arts Campus at Willits has crossed the $3 [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49],"tags":[],"class_list":["post-2454126","post","type-post","status-publish","format-standard","category-local-news"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-08-18 17:21:41","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSPN The Valley&#039;s Quality Rock","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kspn","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2454126","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/comments?post=2454126"}],"version-history":[{"count":1,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2454126\/revisions"}],"predecessor-version":[{"id":2454149,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2454126\/revisions\/2454149"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/media?parent=2454126"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/categories?post=2454126"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/tags?post=2454126"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}