{"id":2454449,"date":"2020-02-12T05:00:00","date_gmt":"2020-02-12T12:00:00","guid":{"rendered":"https:\/\/www.aspentimes.com\/?p=320749"},"modified":"2020-02-12T05:00:00","modified_gmt":"2020-02-12T12:00:00","slug":"snowmass-town-council-work-session-recap-updates-on-proposed-mall-transit-center-town-park-redesign","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kspn\/local-news\/snowmass-town-council-work-session-recap-updates-on-proposed-mall-transit-center-town-park-redesign\/","title":{"rendered":"Snowmass Town Council work session recap: Updates on proposed mall transit center; town park redesign"},"content":{"rendered":"<figure class=\"wp-block-image p402_hide\">\n<div class=\"caption-container\"> <img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"662\" src=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/02\/council-svs-111319-1-2-1024x662.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/02\/council-svs-111319-1-2-1024x662.jpg 1024w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/02\/council-svs-111319-1-2-300x194.jpg 300w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/02\/council-svs-111319-1-2-768x497.jpg 768w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/02\/council-svs-111319-1-2-1536x994.jpg 1536w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/02\/council-svs-111319-1-2-2048x1325.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><figcaption><strong>An image of the proposed mall transit center&#8217;s Option 5 design. <\/strong><br \/><em><\/em><\/figcaption><\/div>\n<\/figure>\n<p class=\"STND-STND BodyText\">During a roughly 90-minute work session Feb. 10, Snowmass Town Council heard updates on a few ongoing town projects, including the proposed mall transit center and Town Park reconfiguration. Here\u2019s the recap:<\/p>\n<p class=\"STND-STND BodyText Subhead\">TOWN EXPLORING \u201cOPTION 5\u201d FOR MALL TRANSIT CENTER<\/p>\n<p class=\"STND-STND BodyText\">Town Council members got a peek at a modified design for the proposed mall transit center, known as Option 5, at its work session Feb. 10.<\/p>\n<p class=\"STND-STND BodyText\">Before working with S.E.H consultants to create an architectural rendering and better cost estimates of the new option, Clint Kinney, town manager, and David Peckler, town transportation director, explained that staff wanted to ensure Option 5 was a step in the right direction for the proposed transit center.<\/p>\n<p class=\"STND-STND BodyText\">\u201cWe\u2019re hoping to land a visual for you much like we had in the last packet but we want to make sure we\u2019re designing what you want, not guessing at what you want,\u201d Peckler said.<\/p>\n<p class=\"STND-STND BodyText\">Town Council gave town staff the OK to pursue Option 5 in November after council members and community members expressed reservations about the mass and scale of the Option 4 Village Mall transit center plan.<\/p>\n<p class=\"STND-STND BodyText\">As previously reported, the Option 4 design included a bus platform at the mall level with four Roaring Fork Transportation Authority bus bays and six local shuttle bus bays, along with a roughly 60-space parking area and roadway below the bus platform that will replace existing Lot 6.<\/p>\n<p class=\"STND-STND BodyText\">The new Option 5 design is largely the same, but includes a smaller bus platform, reduced by roughly 10 feet along the north\/south axis, and pulls the connecting road from Upper Brush Creek Road to Lower Carriage Way out from beneath the platform deck.<\/p>\n<p class=\"STND-STND BodyText\">Town Council briefly discussed the new option, which they are set to see again in more detail with a formal presentation from consultants at the March 2 regular meeting.<\/p>\n<p class=\"STND-STND BodyText\">\u201cI think it\u2019s a vast improvement,\u201d Councilman Bill Madsen said. \u201cI think it\u2019s looking really good and the more I look at the RFTA and shuttle bus depot we have now, we can\u2019t get this going fast enough.\u201d<\/p>\n<p class=\"STND-STND BodyText Subhead\">TWO DESIGNS TO MOVE FORWARD FOR TOWN PARK<\/p>\n<p class=\"STND-STND BodyText\">On top of receiving an update on the proposed mall transit center project, Town Council also got an update on the proposed redesign of Town Park.<\/p>\n<p class=\"STND-STND BodyText\">At the Nov. 11 special Town Council meeting, Andy Worline, town parks, recreation and trails director, presented the top two Town Park redesign plans of the five originally proposed that were most supported by local stakeholders: Option 3, which slightly reorients the rodeo arena and increases field space; and Option 5, a hybrid option that moves the rodeo arena to where the softball field is now and significantly increases field space and parking.<\/p>\n<p class=\"STND-STND BodyText\">At the Feb. 10 meeting, Worline aimed to gain more feedback from Town Council on the top two conceptual design options, both of which town staff hopes to pursue in its efforts to narrow the project focus.<\/p>\n<p class=\"STND-STND BodyText\">As before, Town Council voiced support for Option 3. But as the town\u2019s Parks, Open Space, Trails and Recreation Board overwhelmingly has voiced support for Option 5, Kinney explained, town staff hopes to move forward with both options.<\/p>\n<p class=\"STND-STND BodyText\">\u201cI\u2019ve sat in POSTR board meetings to know they love (Option) 5, I\u2019ve sat in council meetings to know that you\u2019re leaning toward (Option) 3, it\u2019s our recommendation that you guys get more information,\u201d Kinney said.<\/p>\n<p class=\"STND-STND BodyText\">\u201cWe think the two best options have been selected and that more data at this point would be more helpful.\u201d<\/p>\n<p class=\"STND-STND BodyText\">Council ultimately supported the direction of moving forward with both options, but emphasized the importance of continuing to include Jazz Aspen Snowmass in its planning decisions moving forward, as the nonprofit said it is considering a change of venue for its Labor Day Experience other than Town Park in 2021.<\/p>\n<p class=\"STND-STND BodyText\">Town staff said it plans to use the some of the $100,000 budgeted for the Town Park redesign project this year to pursue more detailed versions of Option 3 and Option 5 with its contractors, which will be brought back before council at a regular meeting when completed.<\/p>\n<p class=\"STND-STND BodyText Tagline\"><a href=\"mailto:mvincent@aspentimes.com\">mvincent@aspentimes.com<\/a><\/p>\n<p><a href=\"https:\/\/www.aspentimes.com\/snowmass\/snowmass-town-council-work-session-recap-updates-on-proposed-mall-transit-center-town-park-redesign\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: The Aspen Times<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>An image of the proposed mall transit center&#8217;s Option 5 design. During a roughly 90-minute work session Feb. 10, Snowmass Town Council heard updates on a few ongoing town projects, including the proposed mall transit center and Town Park reconfiguration. Here\u2019s the recap: TOWN EXPLORING \u201cOPTION 5\u201d FOR MALL TRANSIT CENTER Town Council members got [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49],"tags":[],"class_list":["post-2454449","post","type-post","status-publish","format-standard","category-local-news"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-08-18 16:01:13","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSPN The Valley&#039;s Quality Rock","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kspn","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2454449","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/comments?post=2454449"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2454449\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/media?parent=2454449"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/categories?post=2454449"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/tags?post=2454449"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}