{"id":2455716,"date":"2020-03-12T22:16:00","date_gmt":"2020-03-13T04:16:00","guid":{"rendered":"https:\/\/www.aspentimes.com\/news\/gwood-prepares-for-summer-of-canyon-construction\/"},"modified":"2020-03-12T22:16:00","modified_gmt":"2020-03-13T04:16:00","slug":"gwood-prepares-for-summer-of-canyon-construction","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kspn\/local-news\/gwood-prepares-for-summer-of-canyon-construction\/","title":{"rendered":"G\u2019wood prepares for summer of canyon construction"},"content":{"rendered":"<figure class=\"wp-block-image p402_hide\">\n<div class=\"caption-container\"> <img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/03\/CanyonConstruction-gpi-031220-12-1024x768.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/03\/CanyonConstruction-gpi-031220-12-1024x768.jpg 1024w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/03\/CanyonConstruction-gpi-031220-12-300x225.jpg 300w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/03\/CanyonConstruction-gpi-031220-12-768x576.jpg 768w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/03\/CanyonConstruction-gpi-031220-12-1536x1153.jpg 1536w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/03\/CanyonConstruction-gpi-031220-12-2048x1537.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><figcaption><strong>Cars sit and wait while being diverted down to one lane near the Grizzly Creek rest area in Glenwood Canyon.<\/strong><br \/><em>Chelsea Self \/ Post Independent<\/em><\/figcaption><\/div>\n<\/figure>\n<p class=\"STND-STND BodyText\">Driving through Glenwood Canyon will require patience and extra time this summer.<\/p>\n<p class=\"STND-STND BodyText\">Starting in late March, traffic on Interstate 70 for 6 miles through the canyon will be diverted into one lane in each direction on the lower, eastbound deck, while crews resurface the westbound lanes.<\/p>\n<p class=\"STND-STND BodyText\">The single-lane set up will likely last to the end of the project, expected to be completed in October.<\/p>\n<p class=\"STND-STND BodyText\">\u201cThis project will be outside of Glenwood Springs city limits but will certainly impact residents, commuters and visitors to our region this summer,\u201d said Sarah Derrigan, spokesperson for the City of Glenwood Springs.<\/p>\n<p class=\"STND-STND BodyText\">But the Department of Transportation says most people they\u2019ve talked to accept that the interstate is in need of extensive repairs.<\/p>\n<p class=\"STND-STND BodyText\">\u201cOverall, we are hearing from individuals that they understand that this work is important and that it needs completed now,\u201d CDOT spokesperson Elise Thatcher said.<\/p>\n<p class=\"STND-STND BodyText\">\u201cHere locally and regionally, there is a community understanding that summer in the canyon means ongoing construction work and maintenance improvements in the canyon,\u201d Thatcher said.<\/p>\n<p class=\"STND-STND BodyText\">CDOT has conducted several community meetings in Glenwood Springs and Gypsum to discuss plans and the expected impacts.<\/p>\n<p class=\"STND-STND BodyText\">The delays could also affect the Hanging Lake shuttle, but the service will start transporting hikers with permits to the iconic trail from Glenwood Springs beginning in May.<\/p>\n<p class=\"STND-STND BodyText\">\u201cWhile delays are expected for all vehicles, including the shuttle, the Hanging Lake partnership has been in communication with CDOT\u2019s project team to ensure an efficient and effective shuttle operation,\u201d said Sarah Derrigan, spokesperson for the city of Glenwood Springs.<\/p>\n<p class=\"STND-STND BodyText\">The main section of the work, and the head-to-head configuration, will be between No Name Rest Area exit (mile marker 119) and the Hanging Lake tunnel (mile marker 127).<\/p>\n<p class=\"STND-STND BodyText\">I-70 in that section will be getting a polyester concrete overlay, which CDOT believes will be more durable in harsh conditions, like ice and snow, and even the occasional rockfall.<\/p>\n<p class=\"STND-STND BodyText Subhead\">Detours returning from Shoshone and Grizzly Creek<\/p>\n<p class=\"STND-STND BodyText\">One of the major inconveniences for recreationists and outfitters is that when the head-to-head configuration begins, there won\u2019t be a way to return to westbound I-70 from Grizzly Creek or Shoshone.<\/p>\n<p class=\"STND-STND BodyText\">CDOT hopes to reopen westbound entrances at those places in late June, but until then, people trying to return to Glenwood from those exits will have to travel east and turn around at Bair Ranch.<\/p>\n<p class=\"STND-STND BodyText\">Another meeting March 16 at Morgridge Commons will discuss impacts on river, hiking and other recreation in the canyon.<\/p>\n<p class=\"STND-STND BodyText\">That should reduce the need for annual repairs, and CDOT predicts the new section will have up to a 20-year lifespan.<\/p>\n<p class=\"STND-STND BodyText\">\u201cBy resurfacing with polyester concrete, this area will benefit from a number of positives including a long life cycle, strong live load capacity, and strong tensile strength. It also has low permeability, making it less susceptible to potholing due to seepage and freeze-thaw cycles,\u201d according to Thatcher.<\/p>\n<p class=\"STND-STND BodyText\">CDOT will have both lanes of traffic on one freeway direction, known as head-to-head detours, for the majority of the project.<\/p>\n<p class=\"STND-STND BodyText\">\u201cHowever, the direct westbound access from Grizzly and Shoshone is planned to reopen in late June. In early July, we will see crews shift to the shorter workweek with no head-to-head detour on the weekends,\u201d Thatcher said.<\/p>\n<p class=\"STND-STND BodyText\">According to CDOT, the busiest times during the weekday are the standard rush hours from 7 to 10 a.m. and in the evening from 4 to 7 p.m.<\/p>\n<p class=\"STND-STND BodyText\">On the weekends, particularly in the summer, traffic picks up on Fridays and is heavy from 10 a.m. to 4 p.m.<\/p>\n<p class=\"STND-STND BodyText\">\u201cJuly and August see the highest traffic volume in the canyon, so that is why we are getting the westbound lanes open on Friday afternoon,\u201d Thatcher said.<\/p>\n<p class=\"STND-STND BodyText\">To sign up for updates on lane closures, or ask questions, call or text 970-618-5379, or email <a href=\"mailto:GlenwoodCanyon2020@gmail.com\">GlenwoodCanyon2020@gmail.com<\/a>.<\/p>\n<p class=\"STND-STND BodyText\"><span class=\"Body Copy Italic\"><a href=\"mailto:tphippen@postindependent.com\">tphippen@postindependent.com<\/a><\/span><\/p>\n<p><a href=\"https:\/\/www.aspentimes.com\/news\/local\/gwood-prepares-for-summer-of-canyon-construction\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: The Aspen Times<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cars sit and wait while being diverted down to one lane near the Grizzly Creek rest area in Glenwood Canyon.Chelsea Self \/ Post Independent Driving through Glenwood Canyon will require patience and extra time this summer. Starting in late March, traffic on Interstate 70 for 6 miles through the canyon will be diverted into one [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49],"tags":[],"class_list":["post-2455716","post","type-post","status-publish","format-standard","category-local-news"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-08-18 10:54:09","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSPN The Valley&#039;s Quality Rock","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kspn","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2455716","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/comments?post=2455716"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2455716\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/media?parent=2455716"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/categories?post=2455716"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/tags?post=2455716"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}