{"id":2457799,"date":"2020-04-29T05:00:00","date_gmt":"2020-04-29T11:00:00","guid":{"rendered":"https:\/\/www.aspentimes.com\/?p=325004"},"modified":"2020-04-29T05:00:00","modified_gmt":"2020-04-29T11:00:00","slug":"construction-resumes-in-snowmass-under-site-specific-covid-19-safety-plans","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kspn\/local-news\/construction-resumes-in-snowmass-under-site-specific-covid-19-safety-plans\/","title":{"rendered":"Construction resumes in Snowmass under site-specific COVID-19 safety plans"},"content":{"rendered":"<figure class=\"wp-block-image p402_hide\">\n<div class=\"caption-container\"> <img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"682\" src=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/04\/construction-svs-042920-1-1024x682.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/04\/construction-svs-042920-1-1024x682.jpg 1024w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/04\/construction-svs-042920-1-300x200.jpg 300w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/04\/construction-svs-042920-1-768x512.jpg 768w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/04\/construction-svs-042920-1-1536x1024.jpg 1536w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/04\/construction-svs-042920-1-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><figcaption><strong>Audio visual contractor Peter Koss installs low voltage wiring into a new space in Snowmass Base Village on Tuesday, April 28, 2020. (Kelsey Brunner\/The Aspen Times)<\/strong><br \/><em>Kelsey Brunner\/The Aspen Times<\/em><\/figcaption><\/div>\n<\/figure>\n<p class=\"STND-STND BodyText DropCap\">Snowmass Village grew a little livelier April 27 and 28 after roughly 60 construction sites were approved to start up again so long as approved COVID-19 social distancing and hygiene measures are in place.<\/p>\n<p class=\"STND-STND BodyText\">The town\u2019s community development department worked through the weekend to evaluate each site\u2019s COVID-19 safety plans submitted for continued work, ensuring Snowmass construction started back up in a way that would help the local economy and mitigate the spread of coronavirus as much as possible.<\/p>\n<p class=\"STND-STND BodyText\">\u201cThis is concerning for all of us. No one wants to be sick and no one wants to get sick, but we know it will happen regardless,\u201d said Julie Ann Woods, Snowmass community development director, referring to the expected increase in COVID-19 cases as a result of restarting construction projects in Snowmass and Pitkin County.<\/p>\n<p class=\"STND-STND BodyText\">\u201cIf we can pace things through the site safety plans and are all aware of the potential impacts going in, hopefully we can keep things under control and not overwhelm our hospitals and health care workers.\u201d<\/p>\n<div class=\"row\">\n<div class=\"col\" readability=\"6\">\n<div class=\"row at-donation at-donation-mobile p-0\" readability=\"7\">\n<div class=\"col-xl-4 p-2\">\n<div data-bg=\"url(https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/03\/AT-logo-white.png)\" class=\"p-0 mt-2 mb-2 h-75 text-center rocket-lazyload\"><img decoding=\"async\" src=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/03\/AT-logo-white.png\" class=\"logo m-0 p-0 invisible\"><\/div>\n<\/div>\n<p><h3 class=\"d-inline mr-3\">Support Local Journalism<\/h3>\n<p><button class=\"btn d-inline\" type=\"button\" onclick=\"handleDonationButtonClickMidArticle()\">Donate<\/button><\/p>\n<\/div>\n<p><\/div>\n<\/div>\n<p class=\"STND-STND BodyText\">At the Pitkin County Board of Health meeting April 16, board members and health officials determined construction projects with a submitted and approved \u201cCOVID-19 Site Safety Plan\u201d were permitted to operate, <a id=\"N0x2ab9f80N0x2a1e3a0:N0x2ab9f80N0x2c87638\" href=\"https:\/\/www.aspentimes.com\/news\/snowmass-doubles-its-virus-relief\/\">as previously reported<\/a>. Landscaping companies with a determined COVID-19 business safety plan also were allowed to operate, but not required to have their plans approved before doing so.<\/p>\n<p class=\"STND-STND BodyText\">Starting April 23, existing construction sites forced to shut down as a result of the county\u2019s stay-at-home public health order were allowed to submit their site safety plans to the respective municipality they were working in, or unincorporated Pitkin County if relevant, for approval.<\/p>\n<p class=\"STND-STND BodyText\">Some of the safety plan requirements include designating a project specific public health safety officer, implementation of and education on strict hygiene and social distancing measures, limiting work team interactions and team size when possible and daily monitoring and reporting of employee health, including temperature checks and COVID-19 symptom screenings, <a id=\"N0x2ab9f80N0x2a1e400:N0x2ab9f80N0x2c877e8\" href=\"https:\/\/drive.google.com\/file\/d\/1PAREZHoJVAVFS2hzgxWPL5CPBh8ObV4u\/view\" target=\"_blank\" rel=\"noopener noreferrer\">according to county public health documents<\/a><i class=\"fas fa-external-link-alt\"><\/i>.<\/p>\n<p class=\"STND-STND BodyText\">In Snowmass Village, 56 site safety plans had received approval as of April 27 and four were within the town\u2019s approval process through the community development department.<\/p>\n<p class=\"STND-STND BodyText\">Woods said the department created a workflow to efficiently and effectively go through each application \u2014 moving from permit checking, to plan evaluation and feedback by building officials and town planners, to Woods for final review \u2014 which she feels has worked out pretty well so far. She also said that developers and contractors applying for new building permits through the town also will have to submit a COVID-19 site safety plan moving forward until public health officials advise otherwise. Construction officials must display their approved plans onsite and Snowmass police will help ensure all construction in town is approved and conducted according to the COVID-19 safety guidelines in place, Woods said.<\/p>\n<p class=\"STND-STND BodyText\">\u201cWe\u2019ve definitely had some glitches we\u2019ve worked through, but its gone pretty well,\u201d Woods said of approving town construction sites\u2019 COVID-19 safety plans. \u201cWe\u2019ve never done anything like this before so it\u2019s all new to us but I\u2019m really pleased we were able to get through as many site plans as we did. \u2026 Construction has always been a big part of our local economy and it\u2019s important to get people safely back to work.\u201d<\/p>\n<p class=\"STND-STND BodyText\">Greg Woods, president and founder of G.F. Woods Construction, said he has been very impressed with the approval turnaround time in Snowmass, Aspen and Pitkin County. He is not related to Julie Ann Woods.<\/p>\n<p class=\"STND-STND BodyText\">Greg said April 28 that all seven of his site safety plans submitted had been approved, including three sites in Snowmass Village. He said about one third of the year-round work his company does is in Snowmass, and that his teams were all eager to get back to work this week.<\/p>\n<p class=\"STND-STND BodyText\">Greg feels construction is a good place to start when it comes to easing out of the county\u2019s stay-at-home public health order, as it is an industry that already operates under heightened safety requirements.<\/p>\n<p class=\"STND-STND BodyText\">He also said his staff has been cognizant and more than happy to abide by all of the safety plan requirements, which were not too difficult to put in place, and determined to do its part in helping the local economy safely get back on its feet.<\/p>\n<p class=\"STND-STND BodyText\">\u201cConstruction gives a good read on the local pulse of the economy. If you see dump trucks going up and down (Highway) 82 the economy is probably doing OK, if you don\u2019t see that it\u2019s probably the antithesis,\u201d Greg said.<\/p>\n<p class=\"STND-STND BodyText\">\u201cI think the county is taking some really good first steps to easing back into things. Really in a nutshell we\u2019re all eager to get back to work and get our economy moving again and will do our part to adhere strictly to all the safety requirements to help make that happen.\u201d<\/p>\n<p class=\"STND-STND BodyText\"><a href=\"mailto:mvincent@aspentimes.com\">mvincent@aspentimes.com<\/a><\/p>\n<p><a href=\"https:\/\/www.aspentimes.com\/snowmass\/construction-resumes-in-snowmass-under-site-specific-covid-19-safety-plans\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: The Aspen Times<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Audio visual contractor Peter Koss installs low voltage wiring into a new space in Snowmass Base Village on Tuesday, April 28, 2020. (Kelsey Brunner\/The Aspen Times)Kelsey Brunner\/The Aspen Times Snowmass Village grew a little livelier April 27 and 28 after roughly 60 construction sites were approved to start up again so long as approved COVID-19 [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49],"tags":[],"class_list":["post-2457799","post","type-post","status-publish","format-standard","category-local-news"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-08-17 21:49:31","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSPN The Valley&#039;s Quality Rock","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kspn","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2457799","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/comments?post=2457799"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2457799\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/media?parent=2457799"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/categories?post=2457799"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/tags?post=2457799"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}