{"id":2458087,"date":"2020-05-06T00:48:00","date_gmt":"2020-05-06T06:48:00","guid":{"rendered":"https:\/\/www.aspentimes.com\/news\/giro-and-vuelta-to-overlap-in-revised-cycling-calendar\/"},"modified":"2020-05-06T00:48:00","modified_gmt":"2020-05-06T06:48:00","slug":"giro-and-vuelta-races-are-to-overlap-in-a-revised-2020-cycling-calendar","status":"publish","type":"post","link":"https:\/\/alwaysmountaintime.com\/kspn\/local-news\/giro-and-vuelta-races-are-to-overlap-in-a-revised-2020-cycling-calendar\/","title":{"rendered":"Giro and Vuelta races are to overlap in a revised 2020 cycling calendar"},"content":{"rendered":"<figure class=\"wp-block-image p402_hide\">\n<div class=\"caption-container\">\n<p><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/05\/Virus_Outbreak_France_Tour_de_France_43656-de76c2-1024x683.jpg\" class=\"attachment-large size-large wp-post-image\" alt srcset=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/05\/Virus_Outbreak_France_Tour_de_France_43656-de76c2-1024x683.jpg 1024w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/05\/Virus_Outbreak_France_Tour_de_France_43656-de76c2-300x200.jpg 300w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/05\/Virus_Outbreak_France_Tour_de_France_43656-de76c2-768x512.jpg 768w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/05\/Virus_Outbreak_France_Tour_de_France_43656-de76c2-1536x1024.jpg 1536w, https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/05\/Virus_Outbreak_France_Tour_de_France_43656-de76c2-2048x1366.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><\/p><figcaption><strong>The pack rides during the twelfth stage of the 2019 Tour de France cycling race over 209,5 kilometers, with a start in Toulouse and finish in Bagneres-de-Bigorre, France. This year&#8217;s Tour de France will now start on Aug. 29 in Nice and finish on Sept. 20 in Paris and will be followed by cycling&#8217;s other two major races. The Tour could not start as scheduled on June 27 because of restrictions related to the coronavirus pandemic.<\/strong><br \/><em>Christophe Ena\/AP<\/em><\/figcaption><\/div>\n<\/figure>\n<p class=\"STND-STND BodyText\">BRUSSELS \u2014 The three biggest races in cycling will take place in a 72-day span, starting with the Tour de France at the end of August and finishing with the Spanish Vuelta in November.<\/p>\n<p class=\"STND-STND BodyText\">The Spanish race and the Giro d\u2019Italia will even overlap, assuming competition resumes this year amid the coronavirus pandemic.<\/p>\n<p class=\"STND-STND BodyText\">The International Cycling Union announced its revised calendar on Tuesday, nearly two months after the virus brought bike racing to a halt.<\/p>\n<p class=\"STND-STND BodyText\">According to the latest plans, which can be amended if the health crisis continues, the Tour de France\u2019s start remains slated for Aug. 29 in the Riviera city of Nice. The season is now expected to end after the Spanish Vuelta on Nov. 8.<\/p>\n<div class=\"row\">\n<div class=\"col\" readability=\"6\">\n<div class=\"row at-donation at-donation-mobile p-0\" readability=\"7\">\n<div class=\"col-xl-4 p-2\">\n<div data-bg=\"url(https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/03\/AT-logo-white.png)\" class=\"p-0 mt-2 mb-2 h-75 text-center rocket-lazyload\">\n<p><img decoding=\"async\" src=\"https:\/\/cdn.aspentimes.com\/wp-content\/uploads\/sites\/5\/2020\/03\/AT-logo-white.png\" class=\"logo m-0 p-0 invisible\"><\/p>\n<\/div>\n<\/div>\n<p><h3 class=\"d-inline mr-3\">Support Local Journalism<\/h3>\n<p><button class=\"btn d-inline\" type=\"button\" onclick=\"handleDonationButtonClickMidArticle()\">Donate<\/button><\/p>\n<\/div>\n<p><\/div>\n<\/div>\n<p class=\"STND-STND BodyText\">\u201cIf we manage to have all these races as planned, we will be very happy,\u201d UCI president David Lappartient said in conference call. \u201cThis is the ambition we have.\u201d<\/p>\n<p class=\"STND-STND BodyText\">The major races on the women\u2019s circuit have also been maintained, and the UCI announced the debut of a female Paris-Roubaix on Oct. 25 \u2014 the same day as the men\u2019s event.<\/p>\n<p class=\"STND-STND BodyText\">Lappartient said it is crucial for team sponsors in need of visibility that the three Grands Tours \u2014 the Tour de France, the Giro d\u2019Italia and the Spanish Vuelta \u2014 and the most prestigious one-day classics take place this year. Unlike many other sports which rely on TV rights, cycling\u2019s business model depends on the sponsors channeling money into professional teams.<\/p>\n<p class=\"STND-STND BodyText\">\u201cIf it does not happen, it could plunge our sport in a rather catastrophic situation,\u201d Lappartient said. \u201cAs it stands, we have three months of racing with cycling\u2019s most beautiful events.\u201d<\/p>\n<p class=\"STND-STND BodyText\">The new WorldTour calendar includes 25 events after only five races were held at the beginning of the season. The Giro d\u2019Italia will run from Oct. 3-25 and overlap with the Spanish Vuelta and prestigious one-day races Liege-Bastogne-Liege, the Amstel Gold Race, Gent-Wevelgem and the Tour of Flanders.<\/p>\n<p class=\"STND-STND BodyText\">The Spanish Vuelta has already been cut short to 18 stages and will start on Oct. 20, five days before Paris-Roubaix.<\/p>\n<p class=\"STND-STND BodyText\">The organizers of the Giro said it made different proposals for scheduling races but they were not adopted.<\/p>\n<p class=\"STND-STND BodyText\">\u201cIn order to save and safeguard the important heritage of cycling races, some sacrifices had to be made considering the short time span within which we could include all the season\u2019s races,\u201d RCS Sport said in a statement. \u201cWe made a number of alternative proposals which, in our opinion, would have resulted in reduced overlaps among races in the calendar.<\/p>\n<p class=\"STND-STND BodyText\">\u201cHowever, we believe this result is important for the restart, especially at this time, given the dramatic health situation that is affecting all areas of our lives.\u201d<\/p>\n<p class=\"STND-STND BodyText\">Lappartient said the overlap of the Giro and the Vuelta was inevitable because the Spanish race could not start too late into the season for safety reasons.<\/p>\n<p class=\"STND-STND BodyText\">\u201cThe Vuelta takes place in the Pyrenees mountains, by mid-November the climatic risks \u2014 with snow, and daylight ending earlier \u2014 are too big,\u201d he said. \u201cWe had no other choice than an overlap.\u201d<\/p>\n<p class=\"STND-STND BodyText\">Racing is now expected to resume on Aug. 1 with the Strade Bianche in Italy, followed by the postponed Milan San Remo classic on Aug. 8.<\/p>\n<p class=\"STND-STND BodyText\">The world championships are planned for Sept. 20-27 in Switzerland but organizers have said a final decision will be taken in late June, depending on whether public gatherings of more than 1,000 people are still prohibited in the country.<\/p>\n<p><a href=\"https:\/\/www.aspentimes.com\/news\/giro-and-vuelta-to-overlap-in-revised-cycling-calendar\/\" target=\"_blank\" rel=\"noopener noreferrer\">via:: The Aspen Times<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The pack rides during the twelfth stage of the 2019 Tour de France cycling race over 209,5 kilometers, with a start in Toulouse and finish in Bagneres-de-Bigorre, France. This year&#8217;s Tour de France will now start on Aug. 29 in Nice and finish on Sept. 20 in Paris and will be followed by cycling&#8217;s other [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[49],"tags":[],"class_list":["post-2458087","post","type-post","status-publish","format-standard","category-local-news"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-08-17 18:59:01","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"KSPN The Valley&#039;s Quality Rock","distributor_original_site_url":"https:\/\/alwaysmountaintime.com\/kspn","push-errors":false,"_links":{"self":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2458087","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/comments?post=2458087"}],"version-history":[{"count":0,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/posts\/2458087\/revisions"}],"wp:attachment":[{"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/media?parent=2458087"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/categories?post=2458087"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alwaysmountaintime.com\/kspn\/wp-json\/wp\/v2\/tags?post=2458087"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}